wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

The system life cycle

Total questions: 11

Worksheet time: 9mins

Name
Class
Date
1.

Reorder the following according to the computer system life cycle.

a)

Analysis

b)

Design

c)

Testing

d)

Implementation

e)

Documentation and Evaluation

1)
2)
3)
4)
5)
2.

Match the following analysis methods with descriptions

a)

Interview

1.

Asking people who are using the system

b)

Questionnaire

2.

Collecting responses and feedback using surveys

c)

Examination of documents

3.

Looking for existing data and documentation of the system

d)

Observation

4.

Watching what is going on and how tasks are completed

3.

Which of the following is not a system specification?

a)

The purpose of the system

b)

Input and Output data

c)

How the data is processed

d)

Performance indicators

e)

Customer feedback

4.

Which of the following is not a design stage part?

a)

File/data structures

b)

Input format

c)

Output format

d)

Validation rules

e)

Testing

5.

Match the following validation rules with examples

a)

Length

1.

Password with minimum 8 characters

b)

Type

2.

Only numeric values

c)

Range

3.

Age between 13 and 15 years old inclusively

d)

Format

4.

Date in dd/mm/yy

e)

Presence

5.

No empty field

6.

Which of the following are test types?

a)

Normal data

b)

Extreme data

c)

Abnormal data

d)

Paranormal data

e)

Average data

7.

A (a)   data is actual, real-life data that has been used while the old system was running.

8.

Which of the following is not part of an implementation stage?

a)

Hardware selection

b)

Data files organization

c)

Training

d)

Analyzing

9.

​ ​ (a)   is when the old system is shut down and the new system is started up.

​ (b)   is implementation where one part of the system is changed but the rest part of the system continues to use old methods.

​ (c)   is when the new system is trialled in just one part of the organization.

​ (d)   is when the old system runs alongside the new system until it has proved to be effective.

Choose from the below words
Direct changeover
Phased implementation
Pilot running
Parallell running
10.

Which of the following has to be in both technical and user documentation?

More than one correct answer.

a)

Purpose

b)

Limitations

c)

System flowchard

d)

Troubleshooting

e)

Validation routines

11.

Which one from the image is brown in colour?

a)

White

b)

Brown

c)

Purple

d)

Black