wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

VEPT QUALITY MONTH QUIZ COMPETITION

Total questions: 25

Worksheet time: 9mins

Name
Class
Date
1.

Which statistical tool is used to measure the central tendency of a data set?

a)

Control chart

b)

Scatter plot

c)

Mean

d)

Standard deviation

2.

____ is quality management and quality assurance standard.

a)

ISO22000

b)

ISO9000

c)

ISO14000

d)

None

3.

What is the other name of Deming's cycle?

a)

PDCA

b)

ADCA

c)

MDCA

d)

SDCA

4.

What does M stand for in DMAIC

a)

Management

b)

Measure

c)

Maintenance

d)

Message

5.

_____ is a philosophy of continually seeking ways to improve operations.

a)

Poke – yoke

b)

Kaizen

c)

Robustness

d)

Quality deployment

e)

communication

6.

An opportunity flow diagram as part of a Six-Sigma quality improvement process might be found in which DMAIC category?

a)

Define

b)

Measure

c)

Analyze

d)

Improve

7.

Which of the following is related to lean production?

a)

Philosophy of waste elimination

b)

Lean consumption

c)

Never running out of inventory

d)

The Wahei-Subaru method

8.

Which of the following is an analytical tool used in Six-Sigma quality improvement programs?

a)

Leadership

b)

Pareto charts

c)

Management by fact

d)

Continuous improvement

9.

Global 8D problem solving (G8D) was developed by 

a)

Ford

b)

Volvo

c)

BMW

d)

Daimler

10.

Which step in 8D "Describes the problem"?

a)

D0

b)

D1

c)

D2

d)

D4

11.

The correct application of the 8D method will help to

a)

Avoid the re-occurrence of known problems

b)

Avoid occurrence of all problems identified as part of risk management

c)

Avoid the re-occurrence of unknown problems

d)

Avoid usage of excess budget

12.

How can QUALITY be quantified..? (Q=Quality, P=Performance, E=Expectations)

a)

Q=P/E

b)

Q=P+E

c)

Q=P-E

d)

Q=P*E

13.

Five Whys Theory developed by

a)

Kiichiro Toyoda

b)

Toyota Motor Corporation

c)

Honda Motor

d)

Sinchan

14.

Which one is not the important of Root Cause Analysis (RCA

a)

RCA empower you to identifycorrective and preventive actionsthat are needed

b)

RCA helps you to identify the symtomps

c)

RCA enable you to identify the most essential problem that can be managed and solve by management

d)

RCA enable you to identify the least essential problem that can be managed and solve by management

15.

What is the target of LB PPM..?

a)

<< 100

b)

< 150

c)

\le 100

d)

== 100

16.

What is the target of CBU PPM...?

a)

<< 999

b)

\le 999

c)

>> 1200

d)

\ge 1200

17.

FTT Stands for..?

a)

First time through

b)

Free to talk

c)

Full time temporary

d)

Failure to thrive

18.

Who can develop a poka-yoke device?

a)

Founder

b)

Manager

c)

Anyone in the organization

d)

Co-founder

19.

What is the target of ELB PPM..?

a)

<3100

b)

6000

c)

>3100

d)

<6000

20.

Poka-yoke is also known as ______

a)

Mistake-proofing

b)

Standardization

c)

Process control

d)

Mistake and proofreading

21.
  •  

    HIRA needs to be done by..

a)

Cross functional team

b)

Safety

c)

Operator

d)

 Line Manager

22.

What is product audit demerit target..?

a)

<3

b)

1

c)

5

d)

>3

23.

Choose the incorrect statement related to quality improvement.

a)

Reduces rework

b)

Leads to greater uniformity of product

c)

Increases output with lowered cost

d)

Increases machine time

24.

How many technical pillar's in VPS..?

a)

7

b)

8

c)

13

d)

11

25.

Which pillars establish the right basic condition needed to keep equipment well maintained..?

a)

Autonomous maintenance

b)

Early equipment maintenance

c)

Work place organization

d)

Professional maintenance