1.

When completing the PDI on air conditioning systems, after safe work practices, what is the correct order of the steps?

a)

document ducted air conditioning manufacturer, model number, and serial number and all actions taken on PDI form

b)

plug RV into external 120V AC source

c)

Locate the thermostat for the A/C unit and set to lowest setting

d)

Check for air flow - cooler then ambient temperature through all A/C outlet

e)

Complete documentation on the test, including all recommended repairs and appropriate record-keeping and warranty forms

1)
2)
3)
4)
5)
2.

When completing PDI on the refrigerator, what are the first steps (after safe work practices and documentation)?

a)

plug RV into external 120V AC source

b)

verify propane in container

c)

energize refrigerator from AC power source (set to lowest setting); verify refrigerator cools on AC power source

d)

switch source mode to propane (set to lowest setting); verify refrigerator maintains cool on propane power source

e)

switch source mode to low voltage (set to lowest setting); verify refrigerator remains cool on low voltage power sources

1)
2)
3)
4)
5)
3.

When conducting the refrigerator PDI, which step MAY be optional?

a)

AC mode

b)

low voltage mode

c)

propane mode

d)

shore power

4.

What is the correct order of tasks when completing the furnace PDI?

a)

safe work practices and documentation of appliance

b)

verify propane in container

c)

locate thermostat for furnace and set to highest setting

d)

check for air flow (warmer, then ambient temperature) through all furnace outlets

e)

document actions taken, record-keeping, and warranty forms

1)
2)
3)
4)
5)
5.

After completing safe work practices and documentation, what is the correct order of tasks for completing the water heater PDI on a standard RV?

a)

plug RV into external 120V AC source and verify propane in container

b)

fill water heater

c)

ignite water heater on gas

d)

switch to AC mode, then inspect coolant hose connections

e)

complete documentation

1)
2)
3)
4)
5)
6.

What is the correct order of steps for filling the water heater?

a)

Open pressure and temperature relief valve on water heater; turn on water source; close faucet inside RV; verify water heater is filled

b)

Turn on water source; close faucet inside RV; open hot water faucet; verify water heater is filled

c)

Open hot water faucet; close relief valve; turn on water source; verify water heater is filled

d)

verify water heater is filled; turn on water source; open hot water faucet; open pressure and temperature relief valve on water heater; when water starts to come out of P&T valve, close relief valve; close faucet inside RV

7.

Choose the correct order of steps for completing PDI on a tankless water heater.

a)

ignite source; document make/model/serial number; document actions, etc.; verify propane in container

b)

document make/model/serial number; document actions, etc.; ignite source; verify propane in container

c)

verify propane in container; ignite source; document make/model/serial number; document actions, etc.

d)

document make/model/serial number; verify propane in container; ignite source; document actions, etc.

8.

Place the steps for performing PDI on an oven in the correct order. (Safe work practices and make/model/serial number already completed.)

a)

light oven pilot, verify ignition

b)

set oven thermostat to 300 degrees

c)

visually inspect flame

d)

turn thermostat off

e)

complete documentation

1)
2)
3)
4)
5)
9.

What color should the flame appear when completing an oven PDI?

a)

mostly orange with red tips

b)

mostly purple with yellow tips

c)

mostly yellow with red tips

d)

mostly blue with orange tips

10.

Place the steps for performing PDI on a standard cook top range in the correct order. (Safe work practices and make/model/serial already completed.)

a)

light each burner individually

b)

visually inspect flame for completeness and total circumference of burner head

c)

turn all burners off

d)

document actions taken, warranty, etc.

1)
2)
3)
4)
11.

What is the proper order of steps for conducting a microwave/convection PDI? (Safe work practices and documentation completed.)

a)

plug RV into external 120V AC source

b)

put a cup of tap water inside microwave

c)

set timer to 1 minute and run microwave

d)

verify tap water is hot or warmer

e)

document actions, warranty, etc.

1)
2)
3)
4)
5)
12.

When completing PDI on the microwave/convection, place ​ (a)   of ​ ​ (b)   ​ inside microwave. Set timer to ​ (c)   then verify fluid is hot or warmer.

Choose from the below words
one cup
water
one minute
1/2 cup
two cups
three cups
1/4 cup
liquids
milk
3 minutes