WorksheetsCE168P-2 | SM Mall of Asia 4M's Quiz
Total questions: 10
Worksheet time: 5mins
What is the name of this machine?
Excavators
Motor Graders
Concrete Mixers
Wheel Loader
What machine is used to lift and transport heavy construction materials and equipment?
Bulldozer
Wheel Loader
Excavators
Cranes
Approximately how much manpower is needed for the construction project?
1000-2000
2000-2500
2000-3000
3000-3500
What specialty is assigned to install, maintain, and test the respective systems, electrical systems, HVAC (heating, ventilation, and air conditioning), drainage, and fire protection systems?
Construction Workers
Safety Personnel
Surveyors
Technicians
What drainage material is needed to access the drainage system for inspection and maintenance?
Drainage Grates
Geogrids
Manholes
Drainage Pipes
Which of the following is NOT included in the electric materials needed for the project?
Wiring
Circuit Breakers and Fuses
Lighting Fixtures
Metal sheeting
Which of the following material/s is/are needed for the project?
Aggregates
Masonry
Geogrids
Concrete Pump
Which of the following is NOT a part of the main tasks done by the manpower assigned to procurement?
Selection and Qualification of Suppliers
Bidding and Bid evaluation
Dealing with sub-contractors
Creating procurement standards
This method allows each cable to move freely in relation to the concrete on a long-term basis.
Post-tensioning
Bonded post-tensioned concrete
Unbonded post-tensioned concrete
Simple Pinning System
What method uses tendons made of high-strength steel to reinforce (strengthen) concrete or other materials.
Post-tensioning
Youtz Slick Slab Method
Simple Pinning System
Bonded Post-tensioned concrete