1.

What hardware material is needed to fasten asphalt roof shingles on roof decking?

a)

Common Wire Nail (CWN)

b)

staple wire

c)

tekscrew

d)

finishing nail

2.

The prescribed time required prior to the removal of form of concrete footing.

a)

24 hour

b)

36 hours

c)

48 hours

d)

12 hours

3.

Wall partition wooden framing is called _____________.

a)

joists

b)

jamb

c)

studs

d)

nailers

4.

What is the appropriate painting material for GI sheet roofing?

a)

Alkyd type paint

b)

Acrylic latex type

c)

Lacquer type

d)

Urethane

5.

A common paint film defect where progressive powdering from the surface inward occurs is called _____________.

a)

blistering

b)

peeling

c)

chalking

d)

alligatoring

6.

In the ASEP Steel Handbook, which structural rolled section has the designation "S"?

a)

Structural tee

b)

Wide flange

c)

Standard I beam

d)

Angular

7.

A wall which supports vertical loads in addition to its weight without the benefit of a complete vertical load frame is called __________________.

a)

retaining wall

b)

curtain wall

c)

shear wall

d)

bearing wall

8.

A type of concrete floor having no beam but usually with drop panel and capital is called _____________.

a)

Flat slab

b)

Two way slab

c)

One way slab

d)

Ribbed floor slab

9.

A spirit level is a ____________________________.

a)

tool used for guiding and testing the work to vertical and horizontal position

b)

tool for checking the height elevation

c)

tool used to check water level

d)

tool designated in the different ranking of tool usage

10.

Steel square is a __________________.

a)

small try square

b)

tool for testing and for framing work

c)

steel section used in signage framing

d)

tool for the steelman