AVD Setting Project Requirements Review

Total questions: 10

Worksheet time: 9mins

Name
Class
Date
1.

What is an iteration?

a)

A cyclic process of prototyping, testing, analyzing, and refining a product or process.

b)

Incremental expansion of a project's scope

c)

random sampling for unbiased feedback

d)

An order that adds or deletes content from the original scope of work

2.

What are design comps?

a)

Multiple renditions of the design that meet the goals and purpose, but look visually different (layout, scaling, etc.)

b)

A layout of a web page that demonstrates what interface elements will exist on key pages.

c)

An order that adds or deletes content from the original scope of work

d)

incremental expansion of a project's scope

3.

Which of these are types of data that might be used for demographic segmentation?

a)

age

b)

race

c)

gender

d)

ethnicity

e)

income

4.

What is demographic segmentation?

a)

a precise form of audience identification based on data points like age, gender, marital status, family size, income, education, or other factors

b)

a random sample of a product's users

c)

a way of grouping an audience all together, regardless of data points like age, gender, marital status, family size, income, etc.

d)

a survey of every single customer to customize what they want

5.

Which of these are ways a file could be customized according to a client's needs?

a)

file size

b)

file format

c)

file naming convention

d)

iterations

e)

scope creep

6.

Who identifies the target market?

a)

The client

b)

The audience self-selects

c)

The graphic designer does this.

d)

It's automatic based on customer data

7.

Define scope creep:

a)

The incremental expansion of a project's scope.

b)

A cyclic process of prototyping, testing, analyzing, and refining a product or process.

c)

Beginning a project from scratch and carrying it through to its final completion.

d)

An order that adds or deletes content from the original scope of work

8.

What is a change order?

a)

An order that adds or deletes content from the original scope of work

b)

Multiple renditions of the design that meet the goals and purpose, but look visually different (layout, scaling, etc.).

c)

Identifies a target market and outlines how to reach them.

d)

a file naming convention

9.

What are three of the most important considerations in the Pre-production phase? (choose 3)

a)

Purpose

b)

Target audience

c)

Budget

d)

File formats

e)

Naming conventions

10.

What is a wireframe?

a)

A layout of a web page that demonstrates what interface elements will exist on key pages.

b)

a budget showing what a project will cost the client

c)

a document authorizing and describing changes to an existing project

d)

Multiple renditions of the design that meet the goals and purpose, but look visually different (layout, scaling, etc.).