wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

QUIZ 2

Total questions: 15

Worksheet time: 12mins

Name
Class
Date
1.

In applying plumbing permit, the registered and licensed Master Plumber shall fill out the forms provided the details required by the OBO.

Which of the following is not included under this subsection:

a)

Describe the land upon which the proposed plumbing work is to be done, legal description, street address or similar description that will readily identify and locate the proposed building or work.

b)

Identify and describe the plumbing work to be covered by the permit for which an application is made.

c)

Specify the validity of the permit, the workloads and construction validity.

d)

Be accompanied by plans, drawings, diagrams, computations, technical specifications, and other data as required in Subsection 102.2

2.

How many sets of plumbing plans, drawings, diagrams, design analyses and computations shall be submitted as requirements for application of plumbing permit?

a)

4 sets

b)

6 sets

c)

5 sets

d)

8 sets

3.

Every request for inspection shall be filed at least ____ days before such inspection is intended.

a)

6 days

b)

4 days

c)

2 days

d)

3 days

4.

Who should test all the plumbing systems and ensure that it is in lined with the Plumbing Code?

a)

Administrative Authority

b)

Owner with the Master Plumber

c)

Journeyman

d)

Registered and Licensed Master Plumber

5.

The seal of a licensed master plumber shall include written on the choices except:

a)

Registered and Licensed Master Plumber

    at lower portion of the round seal.

b)

The registration number shall appear at the center below the name.

c)

Philippines appearing at the lower portion of the round seal.

d)

Registered and Licensed Master Plumber

    at upper portion of the round seal.

6.

Section 102 of the code pertains to what?

a)

Application for Existing Plumbing System

b)

Inspections

c)

Permit Issuance

d)

Application for permit

7.

Usage and operation of any plumbing accessory that is installed to replace existing equipment or fixtures shall not be prohibited given that the reinspection request has been files for not more than ___ hours after the replacement work is completed.

a)

62 hours

b)

42 hours

c)

72 hours

d)

52 hours

8.

Two out of four choices below are grounds for the expiration of plumbing permit. Which are the two written in subsection 103.4 of the plumbing code?

a)

the plumbing work authorized therein is not commenced within one year from the date of such permit

b)

If the Registered and Licensed Master Plumber holding a valid, unexpired and unrevoked certificate of registration as required by RA 1378

c)

The Administrative Authority may, in writing, suspend or revoke a permit issued under the provisions of this Code whenever issued in error or on the basis of incorrect information supplied or in violation of pertinent ordinances, rules and regulations

d)

If the plumbing work so authorized is suspended or abandoned at any time after having been commenced for a period of 120 days

9.

In case that the plumbing permit issued expires before the commencement of construction and you as a professional master plumber reapplies the permit in owner's behalf. What is the prescribed fee of the code for renewal of permit?

a)

one fourth of the original fee

b)

one half of the original fee

c)

one third of the original fee

d)

one and one half of the original fee

10.

What are the duties of the person requesting reinspection? Choose three (3):

a)

Provide access

b)

Provide equipment and tools

c)

Provide power and water

d)

Provide the approved plumbing plans, and documents.

11.

The lawful person to do or cause to be done any plumbing work and for applying for a plumbing permit under the provision of RA 1378 or the "plumbing law" ?

a)

NAMPAP

b)

Administrative Authority

c)

Registered and Licensed Master Plumber

d)

Office of the Building Official

12.

According to Section 100 of National Plumbing Code, the Office of the Building Official is under the jurisdiction of the following . Choose (3)

a)

Office of the City Mayor

b)

Department of Public Works and Highways

c)

NAMPAP

d)

Professional Regulation Commission

e)

Department of Interior and Local Government

13.

The Plumbing permits may only be issued to a Registered Master Plumber. A registered and Licensed Master Plumber must have the following:

A. Passed the examinations conducted by the PRC and currently possesses valid license to practice.

B. A seal of the standard size and type as required by the law.

C. A valid, unexpired and unrevoked certificate of registration.

a)

B and C except A

b)

C and A except B

c)

A and B except C

d)

None of the mentioned above.

e)

All of the above

14.

TRUE OR FALSE:

The Administrative Authority may, in writing, suspend or revoke a permit issued under the provisions of this Code whenever issued in error or on the basis of incorrect information supplied or in violation of pertinent ordinances, rules and regulations.

a)

TRUE

b)

FALSE

15.

TRUE OR FALSE?

Based on subsection 103.2 - RETENTION OF PLANS, One (1) set of approved plans, specifications and data shall be returned to the applicant and Owner which shall be kept at the jobsite at all times while the work is in progress.

a)

TRUE

b)

FALSE