Communication Methods in Construction PT2

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What is the purpose of a variation order in construction?

a)

To change the agreed contract price

b)

To implement rapid resolution of variation issues

c)

To save money by avoiding agreement delays

d)

To impact timescales for completion

2.

What is the purpose of a toolbox talk on a construction site?

a)

To discuss topics of safety and reduce accidents

b)

To educate and enlighten contractors

c)

To inform about hazard communication

d)

To discuss practical jokes and horseplay

3.

What is the purpose of safety memos and briefings on a construction site?

a)

To aid communication about new hazards and health and safety issues

b)

To provide updates to standards and regulations

c)

To check contractors' understanding of risks and control measures

d)

To identify manufacturing design or performance problems

4.

What is the purpose of a quality management system in construction?

a)

To consistently meet customer requirements and enhance satisfaction

b)

To track and address events during a project

c)

To ensure that standards and requirements are met

d)

To manage and intervene for quality improvement

5.

What should be considered before ordering plant and materials for a specific job on site?

a)

Potential theft and damage, competences of operatives, and timescale evaluation

b)

Quality planning, control, assurance, and improvement

c)

Anticipating customer requirements and gathering product suppliers

d)

Establishing a chain of command and co-ordination with other trades

6.

Who is considered the most important person in a construction project?

a)

The customer

b)

The architect

c)

The trade supervisor

d)

The construction manager

7.

Who typically checks that the quality of work and installation design adhere to the architect's designs?

a)

The clerk of the works

b)

The trade supervisor

c)

The construction manager

d)

The customer

8.

Who represents each different craft and communicates plans and information during team meetings?

a)

The trade supervisor

b)

The construction manager

c)

The architect

d)

The customer

9.

What is the purpose of site procedures in construction?

a)

To ensure an organized and safe working environment

b)

To communicate requirements to the customer

c)

To facilitate communication between different trades

d)

To provide written confirmation of verbal communication

10.

What are the common methods of communication in construction?

a)

Letter, email, fax, face to face, telephone

b)

Verbal, written formal, email, face to face

c)

Letter, email, verbal informal, telephone

d)

Written formal, verbal informal, face to face, fax