Industrial Construction Quiz

Total questions: 27

Worksheet time: 1hrs 9mins

Name
Class
Date
1.

What is the English equivalent of 'промышленное строительство'?

a)

Industrial construction

b)

Building construction

c)

Highway construction

d)

Heavy construction

2.

Who are the owners of industrial construction projects?

a)

Large construction companies

b)

Large construction management companies

c)

Large, industrial corporations

d)

Small, industrial corporations

e)

Large, for-profit, industrial corporations

3.

Where can these corporations be found?

a)

Medicine, petroleum, chemical, power generation, manufacturing, etc.

b)

Building and heavy/highway construction

c)

Design team and construction companies

d)

Architects, interior designers, civil engineers, etc.

4.

What kind of expertise do processes in these industries require?

a)

General expertise in planning and construction

b)

Specialized expertise in planning, design, and construction

c)

Expertise in medicine, petroleum, chemical, power generation, manufacturing, etc.

d)

Expertise in building and heavy/highway construction

5.

What does industrial construction require a team of individuals for?

a)

To translate paper or computer based designs into reality

b)

To integrate physical proceedings with the other parts

c)

To ensure a successful project

d)

To prepare drawings and specifications

6.

What does construction usually involve in the modern industrialized world?

a)

Translation of paper based designs into reality

b)

Translation of paper or computer based designs into reality

c)

Integration of physical proceedings with the other parts

d)

Preparation of drawings and specifications

7.

What may a formal design team be assembled for?

a)

To award a contract to the lowest responsible bidder

b)

To ensure a successful project

c)

To plan the physical proceedings

d)

To prepare drawings and specifications

8.

Who usually prepares drawings and specifications?

a)

Architects

b)

Interior designers

c)

Civil engineers

d)

Design team

9.

Whom does a design team include?

a)

Individuals and owners

b)

Architects, interior designers, civil engineers, etc.

c)

Construction companies or construction management companies

d)

Surveyors and property owners

10.

When may a number of construction companies or construction management companies be asked to make a bid for a work?

a)

After the design is completed

b)

Before the design is completed

c)

During the design process

d)

At the beginning of the project

11.

Выберите верный перевод предложения: As in building and heavy\highway construction, this type of construction …

a)

Как и в жилищном строительстве и строительстве крупных инженерных сооружений или дорожном строительстве этот тип строительства …

b)

Так как в жилищном строительстве и в строительстве крупных инженерных сооружений или дорожном строительстве этот тип строительства …

c)

И в жилищном строительстве и в строительстве крупных инженерных сооружений в этом типе строительства …

12.

Large, for-profit, industrial corporations own industrial construction projects.

a)

true

b)

false

13.

Industrial construction is a large part of the entire construction industry.

a)

True

b)

False

14.

Owners of industrial construction projects are usually …

a)

large construction companies.

b)

large construction management companies.

c)

large industrial corporations

15.

Выберите два слова: инженер-сметчик

a)

structural engineer

b)

quantity surveyor

c)

cost engineer

d)

civil estimator

16.

гражданский инженер-строитель

a)

quantity surveyor

b)

civil engineer

c)

cost engineer

d)

a surveyor

17.

сметный расчет

a)

a bid for the work

b)

specifications

c)

a bill of quantities

d)

bidder

18.

чертежи и проектные задания

a)

drawings and bids

b)

drawings and proceedings

c)

evaluations and bids

d)

drawings and specifications

19.

After the design is completed construction companies can make a bid for the work.

a)

true

b)

false

20.

The design team is usually in contact with the property owner.

a)

true

b)

false

21.

Выберите верный перевод: '… construction usually involves the translation of paper or computer based design into reality.'

a)

… строительство обычно вовлекает перевод реальных проектов, выполненных на бумаге в компьютерные.

b)

… строительство обычно предполагает перевод реальных проектов как на бумагу, так и в компьютерный вариант.

c)

… строительство обычно предполагает претворение в жизнь как бумажных, так и выполненных на компьютере проектов.

22.

Выберите верный перевод: '...once the design is completed by the design team …

a)

… однажды, когда проект завершен проектной группой …

b)

… так как проект завершается проектная группа …

c)

…  когда проектная группа завершает проект …

23.

Выберите верный перевод: '...Following evaluation of bids, the owner will typically award a contract …'

a)

Следуя оценке тендеров, собственник обычно заключает договор ...

b)

Вследствие оценки заявок, собственник обычно заключает договор ...

c)

После оценки заявок, собственник обычно заключает подрядный договор …

24.

The owner usually awards a contract to the most famous

bidder.

a)

true

b)

false

25.

The physical proceedings are planned by a formal team of

individuals.

a)

true

b)

false

26.

Выберите верный перевод слова: коммерческий

a)

assemble

b)

involve

c)

for-profit

d)

bidder

27.

инженер-проектировщик (2 ответа)

a)

cost engineer

b)

structural engineer

c)

civil engineer

d)

design engineer