Cannock inspection only

Total questions: 16

Worksheet time: 17mins

Name
Class
Date
1.

The term given to the person responsible for an electrical system is the:

a)

Competent person

b)

Electrician

c)

Duty holder

d)

Company manager

2.

EAWR states that working live is acceptable unless:

a)

Suitable tools are used

b)

Suitable PPE is worn

c)

It is reasonable in all circumstances for it to be dead

d)

An engineer gives you permission

3.

What is the IP rating for the top of an electrical enclosure

a)

IP4X

b)

IP2X

c)

IPXXB

d)

IP

4.

What is the inspection and testing process called for a new installation.

a)

Fault Finding

b)

Minor works

c)

Initial Verification

d)

Periodic inspection and testing

5.

What does the initial verification prove?

a)

the installation is safe to stay into service

b)

the installation is safe to put into service

c)

the installation does not work

d)

the installation needs a minor works certificate

6.

what certificate should be provided for an alteration to an existing circuit?

a)

electrical installation minor works certificate

b)

electrical installation certificate

c)

electrical installation condition report

d)

an invoice

7.

Who should be provided with the original copies of test documentation upon completion of a rewire of a rented domestic property?

a)

A. The client.

b)

B. The tenant.

c)

C. The local authority.

d)

D. The insurance company.

8.

Which Part of the Regulations BS7671 would I find inspection and testing in

a)

Part 8

b)

Part 1

c)

Part 4

d)

Part 6

9.

Which of the below options would I find on the schedule of inspections.

a)

Earth loop Impeadance values

b)

Isolation and Switching

c)

Maximum PFC values

d)

Functional test

10.

What inspection is listed in the schedule of inspections on an EIC

a)

Maximum Insulation Resistance result

b)

Maximum ZS results

c)

Condition of consumers intake equipment

d)

Trip time of RCDs

11.

What is the area inside the bath defined as

a)

Zone 1

b)

The Wet zone

c)

Zone 0

d)

Outside Zones

12.

What part of the building regs is applicable to electrical installations in dwellings

a)

Part L

b)

Part M

c)

Part E

d)

Part P

13.

What is the area under the bath defined as if accessible with the use of a tool.

a)

Zone 2

b)

Zone 1

c)

Outside Zones

d)

Zone 0

14.

How near the Bath can I install a socket

a)

2M as long as its protected by an RCD

b)

2.5M

c)

Anywhere as long as its weather proof

d)

Outside Zones

15.

If a 230v installation has a external earth loop impedance value of 0.30 ohms

What would the PFC rating be?

a)

10 ka

b)

6 ka

c)

.76 ka

d)

.42 ka

16.

If a 230v installation has an external earth loop impedance reading of 0.10 ohms.

What would the PFC rating be

a)

10 ka

b)

29 ka

c)

10000 ka

d)

2.3 ka