WorksheetsSTANDARDS PROFESSIONAL PRACTICE
Total questions: 20
Worksheet time: 10mins
This method of compensation is based on technical hours spent and is only applicable to non-creative work since the value of design cannot be measured by the length of time the designer has spent on his work. This is usually used for works such as accounting, secretarial, research,data gathering preparation of reports and the like.
PCC
MDPE
PFPE
LUMP SUM OR FIXED FEE
It is the most common method of compensation which is also fair to both the client and architect.
Percentage based on Project fee
Professional fee plus Expenses
Lump Sum or fixed Fee
MDPE
A statue specifying the period of time within which legal action must be brought for alleged damage or injury
LEASE
STATUE OF FRAUDS
STATUE OF LIMITATION
LEASEHOLD
A list of instructions stipulating the manner on which bids are to be prepared
INSTRUCTION TO BIDDER
CLOSED SPECIFICATION
STATUE OF LIMITATION
PERFORMANCE BOND
A stipulation of the use of specific products or processes without provision for substitution
BID
CLOSED SPECIFICATION
PERFORMANCE BOND
CERTIFICATE OF PAYMENT
An offer to perform the work prescribed in a contract at a specified cost
BID
PERFORMANCE BOND
CERTIFICATE OF PAYMENT
QUOTATION
Means to built in, mount in position, connect or apply any object specified ready for the intended use.
INSTALL
PROVIDE
WORK
FURNISH
In design-build services, the single point responsibility of project delivery puts the legal liability for both the design and construction on the.
Architect
Owner
Contractor
Manufacturer
The release of 10% retention by the owner shall be done after how many months from the date of final payment
1 Month
4 Months
2 Months
3 Months
Printed documents stipulating the procedural and administrative aspect of the contract
General Conditions
Quotation
Certificate of Payment
Performance Band
A price given by a contractor, subcontractor, material supplier or vendor to furnish material, labor or both.
Quolation
Statutory Band
Certificate of Payment
Statue of Limitation
A statement from the architect confirming the amount of money due the contractor for work accomplished
General Condition
Quotation
Certificate of Payment
Performance Band
A bond furnished by the contractor and his surety as a guarantee to execute the work in accordance with the terms of the contract
Statutory Band
Closed Specification
Certificate of Payment
Performance Bond
The offer of a bidder to perform the work described by the contract documents when made out and submitted on the prescribed proposal form, properly signed and sealed
Bid Bulletin
Special Provision
Proposal
Proposal Bond
The cashier's check or surety bond accompanying the proposal submitted by the bidder, as a guaranteed that the bidder will enter into a contract with the owner for the construction of the work. If the contract is awarded
Proposal Bond
Special Provision
Specifications
Written Notice
Instruction which may be issued prior to the bidder to supplement and or/ modify drawings specifications and/ or general conditions of the contract
Bid Bulletin
Proposal
Special Provision
Proposal Bond
Written or printed description of work to be done describing qualities of material and mode of construction-if there is a variance/discrepancy between the drawing and specifications, what shall be followed?
Written Notice
Specifications
Proposal
Special Provision
At what phase will the Architect prepare the Architectural layout Electrical, Mechanical and Plumbing Systems?
Project Definition Phase
Schematic Design Phase
Design Development Phase
Contract Document Phase
After completion of contract drawings, specifications and other documents upon submission to a client, what stage is this?
Contract Document Phase
Construction Phase
Bidding or Negotiation Phase
Design Development Phase
Where does Contract Document fall in the Architect’s Services?
Pre-Design Services
Regular Services
Feasibility Study
Construction Document