wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Sewerage Works Measurement

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What is the unit of measurement for excavation of sewerage pipe?

a)

M2

b)

M3

c)

M

d)

No

2.

What is the unit of measurement for excavation of manhole?

a)

M2

b)

M3

c)

M

d)

No

3.

The following are the type of manhole. Except..

a)

Deep Manhole

b)

Shallow Manhole

c)

Small Manhole

d)

Normal Manhole

4.

There is only one type of manhole which is a precast concrete manhole.

a)

True

b)

False

5.

The following are the measurement items in the brick manhole. Except..

a)

Brick

b)

Benching

c)

Cover

d)

Painting

6.

What is the organization that manages sewerage disposal in Malaysia?

a)

Sada

b)

TNB

c)

TM Point

d)

IWK

7.

The following are the functions of the manhole. Except..

a)

Change direction of pipe

b)

To connect with treatment plant

c)

For maintenance

d)

At junction

8.

Temporary boxing is needed to make holes for manhole cover

a)

True

b)

False

9.

Connection to mains and testing is compulsory in sewerage work.

a)

True

b)

False

10.

Isolated houses always direct their sewerage disposal to oxidation pond rather than using septic tank.

a)

True

b)

False