wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

L2 Unit 103 Planning process

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What is the main responsibility of a development control officer?

a)

Ensuring that all work carried out meets the relevant regulations

b)

Protecting and conserving a diverse range of buildings

c)

Assessing planning applications and evaluating the outcomes

d)

Inspecting and surveying buildings and writing reports on their condition

2.

Who is responsible for inspecting and surveying buildings and writing reports on their condition?

a)

Building heritage conservation officer

b)

Building control officer

c)

Building conservation officer

d)

Development control officer

3.

When does a building control officer conduct inspections?

a)

Before the concrete is poured into a foundation trench

b)

When the roof is going on

c)

When construction is finished

d)

All of the above

4.

What is the purpose of building regulations?

a)

To protect people's safety, health, and welfare in and around buildings

b)

To improve the conservation of fuel and power

c)

To promote sustainable development

d)

All of the above

5.

What is the main purpose of scheduling monuments?

a)

To identify monuments of national importance

b)

To protect and preserve scheduled monuments

c)

To promote tourism and cultural heritage

d)

To manage and regulate construction projects

6.

How many world heritage sites does Wales currently have?

a)

4

b)

2

c)

1

d)

3

7.

What is the status given to a building of special local interest?

a)

Local listing

b)

Conservation area consent

c)

Ecclesiastical exemption

d)

Listed building consent

8.

What is the penalty for breaching legislation or damaging a listed building?

a)

Prison

b)

Court order to undo the work and/or a Fine

c)

Blacklist from future listed building work

d)

All of the above

9.

What type of consent is required to demolish a building in a conservation area?

a)

Scheduled monument consent

b)

Building regulations approval

c)

Conservation area consent

d)

Planning permission

10.

Which document covers Electrical safety in building regulations?

a)

Part A

b)

Part L

c)

Part P

d)

Part M