Font size
S
M
L
XL
WorksheetsCSA RIOS
Total questions: 8
Worksheet time: 5mins
Name
Class
Date
1.
What does RIO mean?
a)
Rise, Imagine, Operate
b)
Risk, Issue, Object
c)
Risk, Issue, Opportunity
d)
River, Igloo, Orange
2.
Risk can affect the project outcome if they become reality.
a)
True
b)
False
3.
Who painted the Sistine chapel?
a)
Pablo Picasso
b)
Van Gogh
c)
Andy Warhol
d)
Miguel Ángel
4.
It is not necessary to close an Issue
a)
True
b)
False
5.
These are the colors to measure the RIOs
a)
Yellow
b)
Green
c)
Red
6.
Which team does this logo stands for?
a)
Patriots
b)
Lakers
c)
Chiefs
d)
Dolpins
7.
Chose a good acceptable corrective action that include DELIVERABLES
a)
Update tooling status
b)
Release all drawings / Johannes / September 30, 2012
c)
Improve timing
d)
Add 2 CAD Designers / Arnold
8.
Which color represents a High Risk?
a)
Blue
b)
Red
c)
Green
d)
Yellow
Reset
