1.
  1. 1. What is the title for this PTS 18.06.01?

a)

Incident Notification, Investigation and Reporting

b)

Accident Notification, Investigation and Reporting

c)

Incident Notification, Review and Reporting

d)

Notification of Incident and Investigation Reporting

2.
  1. 2. What is the total number of incident cases recorded from Electrical Energy (YTD October 2023)?

a)

30

b)

15

c)

21

d)

20

3.
  1. 3. Which of the following is NOT the step applied for RBI sampling method?

a)

Define Lots

b)

Define Grade of Inspection

c)

Define Type of Inspection

d)

Define Rejection Criterion (Re)

e)

Define Frequency of Inspection

4.
  1. 4. Which of the following facilities are the pilot (PoC) for Ex EBI implementation?

a)

TGAST

b)

BNCPP

c)

ANGSI

d)

KUMANG

5.
  1. 5. How many power transformer with voltage rating of 275kV/34.5kV available at PRPC UF?

a)

27

b)

28

c)

26

d)

25

6.
  1. 6. When is the target date set by PRPC UF to complete all 28 units of transformer tertiary bushing modification work?

a)

January 2024

b)

February 2024

c)

March 2024

d)

April 2024

7.
  1. 7. Which of the following is NOT the basic component in ORC technology?

a)

Evaporator

b)

Expander

c)

Condenser

d)

Inverter

8.
  1. 8. Which of the following is NOT the benefit of ORC technology?

a)

Increase energy efficiency

b)

Reduce carbon emission

c)

Increase heat generation

d)

Reduce electricity bill

9.
  1. 9. What is the definition of NWOW3A?

a)

New Way of Working Anywhere, Anytime, Anyone authorized

b)

New Way of Working, Everywhere, Anytime, Anyone authorized

c)

New Way of Working, Accurately, Anytime, Anyone authorized

d)

New Way of Working, Actively, Accurately, Anyone authorized

10.
  1. 10. What is the security level requirement for IS application such as PERFECT, STARTUPS, PATH, REALM and AHI?

a)

3.5

b)

4

c)

3

d)

2

11.
  1. 11. What is the studies been performed to determine for MLNG power optimization?

a)

Load Flow and Short Circuit Study

b)

Load Flow and Protection Relay Coordination

c)

Load Flow Study and Transient Study

d)

Motor Re-acceleration and Transient Study

12.
  1. 12. Which base case has been chosen for MLNG power optimization?

a)

Base case 1

b)

Base case 2

c)

Base case 3

d)