Font size
Worksheets#4/2023 Lights Up Internal
Total questions: 12
Worksheet time: 6mins
1. What is the title for this PTS 18.06.01?
Incident Notification, Investigation and Reporting
Accident Notification, Investigation and Reporting
Incident Notification, Review and Reporting
Notification of Incident and Investigation Reporting
2. What is the total number of incident cases recorded from Electrical Energy (YTD October 2023)?
30
15
21
20
3. Which of the following is NOT the step applied for RBI sampling method?
Define Lots
Define Grade of Inspection
Define Type of Inspection
Define Rejection Criterion (Re)
Define Frequency of Inspection
4. Which of the following facilities are the pilot (PoC) for Ex EBI implementation?
TGAST
BNCPP
ANGSI
KUMANG
5. How many power transformer with voltage rating of 275kV/34.5kV available at PRPC UF?
27
28
26
25
6. When is the target date set by PRPC UF to complete all 28 units of transformer tertiary bushing modification work?
January 2024
February 2024
March 2024
April 2024
7. Which of the following is NOT the basic component in ORC technology?
Evaporator
Expander
Condenser
Inverter
8. Which of the following is NOT the benefit of ORC technology?
Increase energy efficiency
Reduce carbon emission
Increase heat generation
Reduce electricity bill
9. What is the definition of NWOW3A?
New Way of Working Anywhere, Anytime, Anyone authorized
New Way of Working, Everywhere, Anytime, Anyone authorized
New Way of Working, Accurately, Anytime, Anyone authorized
New Way of Working, Actively, Accurately, Anyone authorized
10. What is the security level requirement for IS application such as PERFECT, STARTUPS, PATH, REALM and AHI?
3.5
4
3
2
11. What is the studies been performed to determine for MLNG power optimization?
Load Flow and Short Circuit Study
Load Flow and Protection Relay Coordination
Load Flow Study and Transient Study
Motor Re-acceleration and Transient Study
12. Which base case has been chosen for MLNG power optimization?
Base case 1
Base case 2
Base case 3
Base case 4