NEW
Font size
WorksheetsStructured/Traditional SDM
Total questions: 9
Worksheet time: 5mins
Waterfall Methodology is a sequential development process that means ___________________
One phase must have its preceding phase.
Multiple phases can be conducted concurrently.
One should move to the next phase when the preceding phase completed
Multiple phases can include the same preceding phase.
In the Waterfall, all system requirements are to be captured and documented during the ___________________.
Integration and Testing Phase
System Design Phase
Support and Maintenance Phase
Requirement Gathering and Analysis Phase
Specifying overall processing, system control, input and output, are the aim of _______________
System Design Phase
System Implementation Phase
Integration and Testing Phase
Support and Maintenance Phase
The system is released to the customer/market during the _____________
System Maintenance Phase
System Deployment Phase
System Analysis Phase
System Testing Phase
Which methodology that is suitable for projects with complex database design?
Waterfall
V-Model
Structured Systems Analysis and Design Methodology (SSADM)
Extreme Programming (XP)
Which methodology contains verification and validation at end of each phase?
Waterfall
V-Model
Structured Systems Analysis and Design Methodology (SSADM)
Extreme Programming (XP)
Which methodology was first introduced?
Waterfall
V-Model
Structured Systems Analysis and Design Methodology (SSADM)
Extreme Programming (XP)
The following are the focus of the Waterfall methodology, except ____________________
Detailed documentation
Provide a highly structured and rigorous approach
Product excellent
Able to adapt to changing environment
Which is the drawback of the structured methodologies that are devoid of flexibility (unable to change requirements)?
Rigid
Iterative process
Sequential process
Tunnel vision
