Software project management Introduction

Total questions: 30

Worksheet time: 17mins

Name
Class
Date
1.

A software project has a specific ____________, consumes _____________ and produces ___________________.

(a)  

2.

(a)   consists of all technical and managerial activities required to deliver the deliverables to the client.

3.

Which of the following will be mentioned in the project agreement?

a)

scope

b)

duration

c)

cost

d)

deliverables

e)

delivery dates

4.

(a)   is the work products that will be delivered to the client.

5.

(a)   is the work products that will be delivered to the client.

6.

Which of the following are considered deliverables?

a)

Demonstration of function

b)

Demonstration of non functional requirements

c)

Demonstration of subsystems

d)

Demonstration of requirements from client

7.

(a)   is the activity or set of activities that span the duration of the project.

8.

(a)   is the smallest unit of work subject to management.

9.

(a)   is the major unit of work with precise dates.

10.

(a)   involves the processes required to ensure timely completion of a project.

11.

Which of the following is the strategies for risk reduction

a)

Avoiding the risk

b)

Transferring the risk

c)

Assuming the risk

d)

Escape from risk

12.

Which of the following is the strategies for software change?

a)

Software Maintenance

b)

Architectural transformation

c)

Software Re-engineering

d)

Risk transfer

13.

The process each manager follows during the life of a project is known as

a)

Project Management

b)

Manager life cycle

c)

Project Management Life Cycle

14.

A 66.6% risk is considered as

a)

very low

b)

low

c)

high

15.

Quality planning is the process of developing a quality plan for

a)

team

b)

project

c)

customers

16.

What is the first step in project planning?

a)
  1. Determine project constraints

b)
  1. Determine the budget

c)
  1. Inspect the deliverables

d)
  1. Establish the objectives and scope

17.

A project is anything which is

a)
  1. Not implicitly expressed

b)
  1. Not a physical objective

c)
  1. Implicitly expressed


d)
  1. Social acceptability

18.

Project managers have to assess the risks that may affect a project.

a)

True

b)

False

19.

In the context of software project management, what does WBS stand for?

a)
  1. Work-Based System

b)
  1. Work-Breakdown Structure

c)
  1. Workflow-Based Setup


d)

Workload Balance Schedule

20.

Effective software project management focuses on.

a)
  1. People, Performance, Payoff, Product

b)
  1. People, Product, Process, Project

c)
  1. People, Process, Payoff, Product

d)
  1. People, Product, Performance, Process

21.

Which of the following activity is undertaken immediately after feasibility study and before the requirement analysis and specification phase?

a)
  1. Project Monitoring

b)
  1. Project Planning

c)
  1. Project Control

d)
  1. Project Scheduling

22.

UML stands for________

a)

Union Model Language

b)

Unified Modeling Language

c)

Unifield Mode Language

d)

Union Mode language

23.

What are the parameters for improving software economics ?

a)

Size

b)

process

c)

Personnel

d)

All of Above

24.

COCOMO stands for _________

a)

Construction Cost Model

b)

Constraint Cost Model

c)

Cost Constraint Model

d)

Constructive Cost Model

25.

What is the features of software code ?

a)

Simplicity

b)

Accessibility

c)

Modularity

d)

All of Above

26.

Which of the following is not a project manager's activity ?

a)

Project Control

b)

Project management

c)

Project Planning

d)

Project Design

27.

What is the primary purpose of a process artifact in software project management ?

a)

To showcase the project's graphical design elements.

b)

To provide a record of project communication and decisions.

c)

To outline the code implementation details of the software.

d)

To list the hardware requirements for the project.

28.

What is the primary purpose of checkpoints in software project management?

a)

Allocate project tasks to team members

b)

Define the initial scope of the project

c)

Design the software architecture

d)

Review and validate the progress and direction of the project

29.

Which of the following is NOT a traditional phase of a software project lifecycle?

a)

Initiation

b)

Execution

c)

Coding

d)

Closure

30.

What is the primary goal of the 'Closing' phase in the project lifecycle?

a)

Initiate project tasks

b)

Handle changes to project scope

c)

Ensure the project deliverables meet the requirements

d)

Formalize the completion of the project and hand over deliverables