wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Water Conservation Technologies Quiz

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

What is the estimated daily consumption of wholesome water per person per day according to Building Regulations Part G?

a)

125lts

b)

150lts

c)

100lts

d)

200lts

2.

Which British Standard offers guidance for the installation of rainwater harvesting systems?

a)

BS 1710

b)

BS 8525

c)

BS 8515

d)

BS 8520

3.

What identification is required for the pipework on any rainwater harvesting or greywater recovery system?

a)

Red adhesive tape

b)

Blue adhesive tape

c)

Green adhesive tape with a black stripe

d)

Yellow adhesive tape

4.

What must an installer avoid when connecting up either a rainwater or greywater system as per the Water Regulations?

a)

Use of blue adhesive tape

b)

Direct connection to the sewer system

c)

Use of green adhesive tape

d)

Cross-connect with the mains wholesome cold water supply

5.

What is the main purpose of rainwater harvesting?

a)

To reduce water usage at the point of use

b)

To increase water consumption

c)

To waste water from household activities

d)

To allow rainwater to run off down to the surface water sewer

6.

What is the main purpose of greywater re-use?

a)

To waste water from household activities

b)

To increase water consumption

c)

To reduce water usage at the point of use

d)

To allow rainwater to run off down to the surface water sewer

7.

What is the main source of greywater?

a)

Toilet flushing

b)

Drinking water

c)

Rainwater harvesting

d)

Sinks and showers

8.

What is the main use of rainwater harvesting?

a)

Water for gardens and flushing in toilets

b)

Water for swimming pools

c)

Cooking water

d)

Drinking water

9.

What is the main use of greywater re-use?

a)

Water for gardens and flushing in toilets

b)

Drinking water

c)

Cooking water

d)

Feeding an outside tap and other non-potable uses

10.

What does BS 1710 suggest for the pipework identification on rainwater or greywater systems?

a)

Red adhesive tape

b)

Yellow adhesive tape

c)

Blue adhesive tape

d)

Green adhesive tape with a black stripe

11.

What does BS 8525 Parts 1 and 2 comply with?

a)

Tap aerators

b)

Greywater re-use

c)

Rainwater harvesting

d)

Ground source heat pumps

12.

What is the main benefit of greywater re-use in urban water systems?

a)

Reduction in demand for fresh wholesome water

b)

Increase in waste water required to be conveyed and treated

c)

Reduction in waste water required to be conveyed and treated

d)

Increase in demand for fresh wholesome water

13.

What is the main benefit of rainwater harvesting?

a)

Reduction in waste water required to be conveyed and treated

b)

Increase in demand for fresh wholesome water

c)

Increase in waste water required to be conveyed and treated

d)

Reduction in demand for fresh wholesome water

14.

What is the main purpose of tap aerators and flow restrictors?

a)

To allow rainwater to run off down to the surface water sewer

b)

To waste water from household activities

c)

To reduce water usage at the point of use

d)

To increase water usage

15.

What is the main purpose of dual flush WCs?

a)

To waste water from household activities

b)

To allow rainwater to run off down to the surface water sewer

c)

To reduce water usage at the point of use

d)

To increase water usage