Domestic Hot Water Systems Quiz

Total questions: 22

Worksheet time: 11mins

Name
Class
Date
1.

Lilly and George are studying the open vented system in their Plumbing class. They have learned that the open vent has a primary function. What is it?

a)

To increase the pressure in the system

b)

To control the flow of hot water

c)

To act as a safety relief valve in case of overheating

d)

To regulate the temperature of the hot water

2.

What is the minimum size of the open vent according to BS6700?

a)

24mm

b)

20mm

c)

18mm

d)

22mm

3.

In a direct hot water cylinder system using a boiler, how is the water heated?

a)

By a chamber within the cylinder

b)

By a heat exchanger coil

c)

By an immersion heater

d)

Directly by the boiler

4.

What is the purpose of the F&E cistern in a double feed system?

a)

To feed down to the hot water cylinder

b)

To act as a safety relief valve

c)

To top up the primaries with water

d)

To control the flow of cold water

5.

What is the recommended minimum distance from the exit of the cylinder to the open vent tee to prevent one pipe circulation?

a)

300mm

b)

450mm

c)

350mm

d)

400mm

6.

What is the primary flow and return pipework size in a direct or indirect open vented system?

a)

20mm

b)

18mm

c)

22mm

d)

24mm

7.

What is the heat-up time for high heat recovery cylinders under part L?

a)

30 minutes

b)

25 minutes

c)

20 minutes

d)

15 minutes

8.

What is the primary function of the vent pipe in an open vented system?

a)

To increase the pressure in the system

b)

To act as a safety relief valve in case of overheating

c)

To regulate the temperature of the hot water

d)

To control the flow of hot water

9.

What is the minimum size of the cold feed according to BS6700?

a)

20mm

b)

22mm

c)

24mm

d)

18mm

10.

What is the purpose of the CWSC in an open vented system?

a)

To increase the pressure in the system

b)

To act as a safety relief valve

c)

To store mains water and feed down to the hot water cylinder

d)

To top up the primaries with water

11.

What is the recommended minimum size of the CWSC feeding just the hot system?

a)

100 litres

b)

115 litres

c)

130 litres

d)

150 litres

12.

What is the primary function of the open vent in an open vented system?

a)

To act as a safety relief valve in case of overheating

b)

To regulate the temperature of the hot water

c)

To control the flow of hot water

d)

To increase the pressure in the system

13.

What is the minimum size of the open vent according to BS6700?

a)

18mm

b)

20mm

c)

22mm

d)

24mm

14.

In a direct hot water cylinder system using a boiler, how is the water heated?

a)

By a chamber within the cylinder

b)

Directly by the boiler

c)

By a heat exchanger coil

d)

By an immersion heater

15.

What is the purpose of the F&E cistern in a double feed system?

a)

To top up the primaries with water

b)

To control the flow of cold water

c)

To feed down to the hot water cylinder

d)

To act as a safety relief valve

16.

What is the recommended minimum size of the expansion vessel in an open vented system?

a)

10 litres

b)

15 litres

c)

20 litres

d)

25 litres

17.

In a direct hot water cylinder system using a boiler, what is the primary function of the heat exchanger coil?

a)

To increase the pressure in the system

b)

To act as a safety relief valve

c)

To transfer heat from the boiler to the water

d)

To control the flow of hot water

18.

What is the recommended maximum distance from the exit of the cylinder to the open vent tee to prevent one pipe circulation?

a)

500mm

b)

600mm

c)

700mm

d)

800mm

19.

What is the recommended maximum size of the CWSC feeding just the hot system?

a)

200 litres

b)

225 litres

c)

250 litres

d)

275 litres

20.

Which component in an open vented hot water system is responsible for storing cold water before it enters the cylinder?

a)

Expansion vessel

b)

Cold Water Storage Cistern (CWSC)

c)

F&E cistern

d)

Immersion heater

21.

According to BS6700, what is the recommended minimum size for the primary flow pipe in a direct hot water cylinder system?

a)

20mm

b)

24mm

c)

22mm

d)

18mm

22.

What is the main reason for installing an open vent pipe in a hot water cylinder system?

a)

To reduce water flow

b)

To store hot water

c)

To increase water temperature

d)

To allow air to escape and prevent pressure build-up