1.

What is an additional information on contract documents issued to bidders before date of bidding?

a)

Bid Forms

b)

Invitation to Bid

c)

Bid Bulletin

d)

General Condition

2.

The _________ printed documents stipulating the procedural and administrative aspects of the contract.

a)

Memorandum of Agreement

b)

General Conditions

c)

Material Specifications

d)

Bill of Materials

3.

Under BP 344 , which of the following is NOT generally considered as basic physical planning requirement.

a)

Orientation

b)

Accessibility

c)

Durability

d)

Safety

4.

How are projects classified in determining

the basis for the Architects "Basic Fees"

a)

Structural Components

b)

Total Flloor Area

c)

Degree of project complexity

d)

Material Specifications

5.

A per diem not less than ______ plus traveling and living expenses shall be chargeable to the owner on any occasion where the Architect or his duly authorized representative shall be required to perform services at a local beyond the radius of _____ kilometers from his established office.

a)

500php/50km.

b)

500php/100km

c)

1000php/50km

d)

1000php/100km

6.

Which of the following does NOT constitute the post-construction services of the architect?

a)

building/equipment maintenance

b)

post‐construction evaluation

c)

real property evaluation

d)

building/ground administration

7.

SPP Document replaced the _________.

a)

IAPOA Documents

b)

1975 UAP Documents

c)

1979 UAP Documents

d)

1979 PIA Documents

8.

For Socialized Housing Projects, minor inter‐connecting roads should have a minimum ROW of ________ mts.

a)

10.5 mts

b)

12.5 mts

c)

6.5 mts

d)

8.5 mts

9.

This shall be issued by the Owner to the Contractor following the execution of the Contract Agreement.

a)

Schedule of Completion

b)

Contract Sum Breakdown

c)

Notice to Proceed

d)

Contract Time

10.

The minimum basic fee for hospitals with a project cost below 50 million pesos.

a)

8%

b)

10%

c)

12%

d)

15%

11.

It was created through Executive Order no. 90. It is the highest policy‐making and coordinating office on shelter programs.

a)

NHA – National Housing Authority

b)

NHMFC – National Home Mortgage Finance Corporation

c)

HUDCC – Housing and Urban Development Coordinating

Council

d)

HGC – Home Guarantee Corporation

12.

Per NBC, what is the minimum clearance in the ground floor of a multi‐storey structure?

a)

2100 mm.

b)

2400 mm.

c)

2700 mm.

d)

3000 mm.

13.

Who accredits the National Organization of Architects?

a)

BOA

b)

PRC

c)

IAPOA

d)

UAP

14.

What is one of the most important benefits of hiring a contractor?

a)

Networking

b)

Cost Reduction

c)

Quality Assurance

d)

Increased Production Speed

15.

Per BP 344, what is the minimum width of the doors and elevator doors?

a)

700 mm.

b)

800 mm.

c)

900 mm.

d)

1100 mm.

16.

The fee of the architect for design‐build services on a guaranteed maximum cost aside from his fee for regular design services

a)

5%

b)

10%

c)

15%

d)

20%

17.

If an architect wants to register as a sole proprietorship firm, where will he register?

a)

IAPOA

b)

UAP

c)

SEC

d)

DTI

18.

After all of the Contract Documents have been given to the owner, how much is the liability from the remaining professional fee?

a)

5%

b)

10%

c)

15%

d)

20%

19.

Per NBC, what is the minimum ratio of openings to the wall area:

a)

10%

b)

12%

c)

15%

d)

20%

20.

Who assumes liability for work‐related injuries when you hire your own subcontractors?

a)

Sub-Contractor

b)

You

c)

The State

d)

Special Case

21.

What can you do to protect yourself from getting cheated by paying for work that doesn't get done?

a)

get notarized contracts

b)

file a case

c)

ask all goods and service providers on your job for a lien

release

d)

Nothing

22.

Per NBC, a building permit is revoked after how many days of work has stopped?

a)

60 days

b)

90 days

c)

100 days

d)

120 days

23.

The main purpose of a contractor is to do which of the following?

a)

Basically a Project Manager

b)

Responsible for the hands- on aspect of the project

c)

as Design specialist

d)

as Consultant

24.

How many percent of the contract amount is the Performance Bond?

a)

5%

b)

10%

c)

15%

d)

20%

25.

Lien laws are designed to protect whom?

a)

Client

b)

Architect

c)

Contractor

d)

Consultant

26.

It is the most common method of compensation which is also fair for both client and architect.

a)

Lump Sum

b)

Percentage Base on Project

c)

Professional Fee plus Expenses

d)

MDPE

27.

Under the NBC, hospitals shall have one parking slot for every how many beds?

a)

15

b)

20

c)

25

d)

30

28.

Minimum floor area for a duplex house in economic housing under BP 220

a)

22 sqm.

b)

24 sqm.

c)

26 sqm.

d)

28 sqm.

29.

Minimum thickness of firewall under Bp 220

a)

100 mm.

b)

150 mm.

c)

200 mm.

d)

250 mm.

30.

What is the main component to be considered by the Architect in the formulation of a master development plan is ?....

a)

Elective Component

b)

Mediation Component

c)

Arbitration Component

d)

Legal & Administration Component

31.

Under Design Services, the minimum basic fee of an Architect for a Laboratories with a project construction cost of 50 million and less is ?

a)

6%

b)

7%

c)

8%

d)

10%

32.

The fee of Architect for Design~Build Services by administration aside from his fee for the Regular Design Services is?....

a)

6%

b)

7%

c)

8%

d)

10%

33.

What is the minimum floor area of the toilet for the handicapped?

a)

1700x2000 mm.

b)

1700x1800 mm.

c)

1200x1800 mm.

d)

1200x2000 mm.

34.

What is the minimum lot area for single detached socialized housing according to BP 220?

a)

54 sqm.

b)

64 sqm.

c)

74 sqm.

d)

84 sqm.

35.

It refers to the portion of a roadway or public way that should be kept open and unobstructed at all times for the expedient conduct of fire fighting operations.

a)

Fire Escape

b)

Fire Lane

c)

Fire Exit

d)

Fire Egress

36.

The minimum basic fee of the Architect in designing parking structure with a project construction cost of 50 million and less is ?....

a)

6%

b)

7%

c)

8%

d)

10%

37.

What is the approved abbreviation for the title of

Architect as mandated by Arcasia?

a)

AR

b)

ARCH'T

c)

ARCH.

d)

ARCT

38.

The duration of time allowed by the contract for the completion of the project in any stipulated portion thereof:

a)

Time Table

b)

Project Duration

c)

Time Limit

d)

Contract Time

39.

What is referred to as an outline specifications enumerating the type or trade names of materials to be used?

a)
Schematics
b)
Specifications
c)
Blueprints
d)
Materials list
40.

Minimum basic fee for Group 5 projects (monumental)

a)

8%

b)

10%

c)

12%

d)

15%

41.

To keep information flowing among members of the project team and management:

a)
Ignore communication altogether
b)
Establish effective communication channels
c)
Establish ineffective communication channels
d)
Limit communication to only a few team members
42.

What pre‐design service involves investigating, identifying and documenting the needs of the client for use in the design of the project?

a)
Marketing
b)
Construction
c)
Accounting
d)
Programming
43.

Where would you apply for Bldg permit?

a)

DTI

b)

SEC

c)

OBO

d)

PRC

44.

Which is a reason or ground for non‐issuance, suspension or revocation of a building permit?

a)

Failures to commmence construction within six months

b)

Non-payment of corresponding Fees

c)

Errors founds in plans & specifications

d)

Incorrect Assesment

45.

Architects assist in the determination of requirements of lending agencies, income‐expense relationship and relative demand for different building types in actual financing negotiations.

a)

Economic Feasibility studies

b)

Project Financing

c)

Space Management Studies

d)

Site Selection & Analysis

46.

Which is an unethical action with respect to the Architect's responsibility to his client?

a)

Does not offer preliminary sketches & design without agreement

b)

Advise client/owner to forgo unviable project

c)

Guarantee any estimates or costs of the work

d)

Undertakes construction for a fixed contract sum under design build service

47.

Project Financing is one of the Architect' s services that falls under:

a)

Design Services

b)

Pre‐design Services

c)

Specialized Allied Services

d)

Design‐Build Services

48.

BP 344: In the case of buildings, what does the word INGRESS refer to?

a)

Fire Exit Door

b)

Entrance Door

c)

Exit Door

d)

Emergency Door

49.

The ___ is the current law that regulates the practice of Architecture

a)

RA 8266

b)

RA 9266

c)

RA 2266

d)

RA 3266

50.

Under PD 957, minimum dwelling unit for household units in a condominium is how many square meters: