wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Phase 1: Plumbing processes pp7

Total questions: 7

Worksheet time: 4mins

Name
Class
Date
1.

What is the recommended distance to mark on a timber joist for notching?

a)

0.5m

b)

2.5m

c)

0.28m

d)

1.5m

2.

When drilling into masonry, what type of drill action is required?

a)

Variable speed

b)

No hammer action

c)

Hammer action

d)

Diamond core bits

3.

What is the maximum depth for a vertical chase cut into a wall?

a)

1/6th of the wall thickness

b)

1/2 of the wall thickness

c)

1/4th of the wall thickness

d)

1/3rd of the wall thickness

4.

What should be worn when cutting chases in a wall?

a)

Ear protection, gloves, boots, overalls

b)

Gloves, helmet, mask, boots

c)

Goggles, ear protection, overalls, dust mask

d)

Hard hat, safety vest, gloves, goggles

5.

What is the best practice for installing hot and cold water pipes in a wall?

a)

Use a hammer and chisel

b)

Use a wall chasing machine

c)

Surface mount them for access

d)

Conceal them within the wall

6.

What is the maximum distance a hole can go into a timber joist?

a)

40% of the span

b)

30% of the span

c)

20% of the span

d)

50% of the span

7.

What is the statutory nature of a 'regulation'?

a)

It is a recommendation

b)

It is the law

c)

It is a suggestion

d)

It is a guideline