WorksheetsStud Pack Dream House Build Quiz
Total questions: 10
Worksheet time: 5mins
What is the purpose of the stud pack dream house build?
To build a hospital
To build a school
To build a commercial building
To build a dream house for Jordan
What is the size of the Ledger for the back deck?
20 feet wide
28 feet 5 inches wide
30 feet wide
25 feet wide
What is the critical measurement for the success of the balcony build?
334 and a half inches
300 inches
400 inches
350 inches
What is the purpose of the wedge anchor in the post base?
To provide lighting
To secure the post to the base
To hang decorations
To support the roof
What is the purpose of the bevel on the miter saw?
To level the Ledger
To measure the height of the post
To cut the post
To account for the slope of the slab
What is the purpose of bracing the posts?
To provide lighting
To support the roof
To hang decorations
To keep them plumb and level
What is the size of the treated beam for the porch?
2 by 10
6 by 6
2 by 12
4 by 4
What is the purpose of the Z Max coating on the post caps?
To protect against contact with treated lumber
To provide lighting
To support the roof
To hang decorations
What is the purpose of using a Palm nailer?
To nail the Ledger
To nail the beam
To nail the post base
To nail the post caps
What is the main lesson learned from the stud pack dream house build?
To work slower not faster
To work smarter not harder
To work faster not slower
To work harder not smarter
