What is the purpose of the 2x4 installed on the flat on either side of the 2x2?
To create a decorative ceiling
To provide support for the post base and the pieces running parallel and towards the corners
To support the decking material
To act as a ledger for the roof system
What is the purpose of the chalk line that was popped from the top of the beam to the other end?
To mark the position for the ledger that will support the roof system
To measure the length of the joist for the roof system
To indicate the location for the decorative ceiling installation
To guide the installation of the post base
What is the length of the joist used for the roof system?
86.5 inches
85 inches
94 inches
12.38 inches
What is the purpose of the 2x12 used for the top of the roof?
To provide support for the post base
To support the decking material
To act as a ledger for the roof system
To create the slope part of the roof
What was the method used to align and adjust the five rafters together?
Using a circular saw to cut them individually
Using a level to adjust the height
Using a planer to dial them in
Using a chalk line to mark the alignment
What was the purpose of the 2x4 Ledger installed on the building?
To guide the installation of the post base
To provide support for the ceiling joist
To create a decorative ceiling
To act as a ledger for the roof system
What was the length of the rise for the roof rafter?
86.5 inches
12.38 inches
85 inches
94 inches
What was the purpose of the 6x6 posts used in the construction?
To act as the skeleton of the frame
To support the decking material
To guide the installation of the post base
To create a decorative ceiling
What was the purpose of the 2x4 installed on the flat on either side of the 2x2?
To support the decking material
To act as a ledger for the roof system
To create a decorative ceiling
To provide support for the post base and the pieces running parallel and towards the corners
What was the purpose of the chalk line that was popped from the top of the beam to the other end?
To mark the position for the ledger that will support the roof system
To indicate the location for the decorative ceiling installation
To measure the length of the joist for the roof system
To guide the installation of the post base