WorksheetsConstruction Document Quiz
Total questions: 7
Worksheet time: 4mins
What is the project number for the residential project we looked at?
22-02-06
05.02.2022
A101
23-04-06
When talking about elevations, what does FFE stand for on the elevations?
finished floor elevation
furniture, fittings, and equipment
furniture, fixtures, and equipment
first floor elevation
What is the total heated square footage for the residential project in the final CD set?
4088 sf
6895 sf
10983 sf
5084 sf
What scale is the first floor plan in the SD Set?
3/16" = 1'-0"
1" = 30'-0"
1/4" = 1'-0"
1" = 1'-0"
What does O.C. stand for?
occupied clean
off-center
on-construction
on-center
Find the note in the CD Set. Fill in the blank.
CONT. FOOTINGS TO BE ________ MIN. BELOW GRADE TO BOTTOM OF FOOTING
2
2'0"
2'-0"
2'
If a sheet number is M100, what does the M stand for?
(a)
