Bridge Construction Quiz

Total questions: 43

Worksheet time: 2hrs 9mins

Name
Class
Date
1.

What river is the bridge to be built over?

4 lines
2.

What town in Illinois is the focus of this video?

4 lines
3.

Why did he old bridge need to be replaced? Give at least one reason.

4 lines
4.

Why is a truss bridge so expensive?

4 lines
5.

When did the modern cable-stayed bridge start?

4 lines
6.

Which bridge style did the designers choose for the Alton bridge?

4 lines
7.

What did the confetti show in regards to the Illinois pier in the simulation?

4 lines
8.

How many years did the engineers work in just the design phase of the project?

4 lines
9.

Who pays for mistakes when you do a "Fixed Bid"?

4 lines
10.

What does a coffer dam do?

4 lines
11.

How much weight must the footing hold?

4 lines
12.

Why can't they stop pouring concrete once they start?

4 lines
13.

How long is the river?

4 lines
14.

How did pioneer families cross the river before bridges were built?

4 lines
15.

When was the first bridge built across the river?

4 lines
16.

Where was the first bridge built?

4 lines
17.

How high will the towers rise above the water?

4 lines
18.

What is another name for jigs?

4 lines
19.

How much bad concrete did they discover?

4 lines
20.

What time does a typical 8 hour shift start at?

4 lines
21.

Are the two towers nearly finished by spring?

4 lines
22.

What is happening on the Illinois side as they are building the approach?

4 lines
23.

What did the crew find in the river that they did not expect?

4 lines
24.

How does the banana pipe get its name?

4 lines
25.

What "knits" the bridge together?

4 lines
26.

How did the students test their structures?

4 lines
27.

Where were the steel girders for the roadbed made?

4 lines
28.

How many girders a day can the company make?

4 lines
29.

How long should each cycle of putting on the roadbed take?

4 lines
30.

What is the potential disaster that they encounter now?

4 lines
31.

How do they simulate 50 years of wear and tear on a cable stay?

4 lines
32.

What is the target load?

4 lines
33.

How much an hour does it cost to put a new wedge on?

4 lines
34.

How large is the first gap they need to close?

4 lines
35.

Who checks to see that the bridge parts fit perfectly together?

4 lines
36.

Why do they need to get the piece in before the sun is up?

4 lines
37.

Does the girder fit in place?

4 lines
38.

What time do they achieve success with the girder?

4 lines
39.

What puts the bridge behind schedule?

4 lines
40.

How do they reach their office and supply trailer now?

4 lines
41.

When do the waters finally recede?

4 lines
42.

What problems do they have with the concrete?

4 lines
43.

When do they finish the bridge?

4 lines