wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

QUIZ 1- QC

Total questions: 20

Worksheet time: 15mins

Name
Class
Date
1.

What is the primary responsibility for ensuring the right quality is attained in a construction project?

a)

Engineers

b)

Laborers

c)

Contractor

d)

Owner

2.

Who pays for quality?

a)

Engineers

b)

Laborers

c)

Contractor

d)

Owner

3.

What are the key components of Quality Control?

a)

Process Monitoring, Corrective Actions, Feedback Loop, Risk Management

b)

Management Systems, Documentation and Reporting, Feedback Loop, Training and Competence

c)

Inspection and Testing, Process Monitoring, Documentation, Corrective Actions

d)

Process Design, Audits and Reviews, Risk Management, Training and Competence

4.

Who determines or specifies the quality in a construction project?

a)

Engineer

b)

Laborers

c)

Contractor

d)

Owner

5.

What is the purpose of Quality Assurance in a construction project?

a)

To ignore customer expectations and standards

b)

To increase costs and reduce customer satisfaction

c)

To decrease the project life cycle

d)

To ensure a product or service meets predefined standards and customer expectations

6.

Which is not a main component of Quality Assurance?

a)

Corrective Actions

b)

Training and Competence

c)

Process Design

d)

Risk Management

7.

Who is primarily responsible for ensuring that the right quality is attained in a construction project?

a)

Owner

b)

Engineers

c)

Contractor

d)

Laborers

8.

What is checked as a component of Quality Control in construction?

a)

The number of workers

b)

The location of the project

c)

The quality of materials and the method of construction

d)

The weather

9.

What is the purpose of inspection as a component of Quality Control?

a)

To ensure the work is done according to plans and established methods

b)

To check the quality of materials

c)

To ensure the weather is suitable for construction

d)

To ensure the location of the project is correct

10.

Who is to blame in case Quality Control fails in a construction project?

a)

The laborers

b)

The engineers and supervisors

c)

The owner

d)

The contractors

11.

Quality control is the responsibility of (a)   involved in the construction.

12.

Quality Control is a ____ ______ ; it is like a chain that a weakness in anyone link will cause the whole chain to fail.

(a)  

13.

QUALITY CONTROL, however, is being instituted in the construction industry, not necessarily as corrective measure, but more as a __________ ____.

(a)  

14.

_______ _______ is a set of procedures or activities designed to ensure that a product or service meets specified requirements and standards.

(a)  

15.

_______ _________ is a systematic process that ensures a product or service meets predefined standards and customer expectations through out the entire project life cycle.

(a)  

16.

These are guidelines, methodologies, specifications,

standards and codes that are set forth to be followed

and complied with to get the desired physical,

chemical and mechanical characteristics of the test

sample accurately and reliably.

(a)  

17.

Testing of material is conducted (a)   to

incorporation into the work.

18.

Is an established technique or procedure to determine

the Physical, chemical and mechanical properties of

materials and the results must meet the Standards and

S p e c i f i c a t i o n s b e f o r e s u c h m a t e r i a l s c a n b e

incorporated or used to the intended items of work.

(a)  

19.

QA is concerned with (a)   the

process is performed.

20.

QC is concerned with (a)   is

being delivered (the actual