What is the primary responsibility for ensuring the right quality is attained in a construction project?
Engineers
Laborers
Contractor
Owner
Who pays for quality?
Engineers
Laborers
Contractor
Owner
What are the key components of Quality Control?
Process Monitoring, Corrective Actions, Feedback Loop, Risk Management
Management Systems, Documentation and Reporting, Feedback Loop, Training and Competence
Inspection and Testing, Process Monitoring, Documentation, Corrective Actions
Process Design, Audits and Reviews, Risk Management, Training and Competence
Who determines or specifies the quality in a construction project?
Engineer
Laborers
Contractor
Owner
What is the purpose of Quality Assurance in a construction project?
To ignore customer expectations and standards
To increase costs and reduce customer satisfaction
To decrease the project life cycle
To ensure a product or service meets predefined standards and customer expectations
Which is not a main component of Quality Assurance?
Corrective Actions
Training and Competence
Process Design
Risk Management
Who is primarily responsible for ensuring that the right quality is attained in a construction project?
Owner
Engineers
Contractor
Laborers
What is checked as a component of Quality Control in construction?
The number of workers
The location of the project
The quality of materials and the method of construction
The weather
What is the purpose of inspection as a component of Quality Control?
To ensure the work is done according to plans and established methods
To check the quality of materials
To ensure the weather is suitable for construction
To ensure the location of the project is correct
Who is to blame in case Quality Control fails in a construction project?
The laborers
The engineers and supervisors
The owner
The contractors
Quality control is the responsibility of (a) involved in the construction.
Quality Control is a ____ ______ ; it is like a chain that a weakness in anyone link will cause the whole chain to fail.
(a)
QUALITY CONTROL, however, is being instituted in the construction industry, not necessarily as corrective measure, but more as a __________ ____.
(a)
_______ _______ is a set of procedures or activities designed to ensure that a product or service meets specified requirements and standards.
(a)
_______ _________ is a systematic process that ensures a product or service meets predefined standards and customer expectations through out the entire project life cycle.
(a)
These are guidelines, methodologies, specifications,
standards and codes that are set forth to be followed
and complied with to get the desired physical,
chemical and mechanical characteristics of the test
sample accurately and reliably.
(a)
Testing of material is conducted (a) to
incorporation into the work.
Is an established technique or procedure to determine
the Physical, chemical and mechanical properties of
materials and the results must meet the Standards and
S p e c i f i c a t i o n s b e f o r e s u c h m a t e r i a l s c a n b e
incorporated or used to the intended items of work.
(a)
QA is concerned with (a) the
process is performed.
QC is concerned with (a) is
being delivered (the actual
product or construction output).