Font size
WorksheetsFOR 221 1st Quiz
Total questions: 16
Worksheet time: 11mins
____________ is the science, art, and technology by which lines, distances, angles, and elevations are established and measured on or beneath the Earth’s surface
Surveying
Pacing
Mapping
Geometry
____________ is a type of surveying where the curvature of the Earth is accounted for
Plane Surveying
Topographic Survey
Cadastral Survey
Geodetic Surveying
____________ are errors due to limitations or imperfections in the instrument used, either from faults in manufacturing or improper adjustment of parts
Systematic Error
Random Error
Syntax Error
Blunder
____________ is performed to define and help plan and construct roads, highways, pipelines, etc.
Route Survey
As Built Survey
Control Survey
Construction Survey
____________ is a type of surveying where the curvature of the Earth is neglected, and measurements are made with the Earth considered as a plane surface.
Plane Surveying
Topographic Survey
Cadastral Survey
Geodetic Surveying
____________ is a special type of survey used to establish ground elevation points for map contour generation.
Cadastral Survey
Topographic Survey
Control Survey
Relocation Survey
____________ is the person responsible for the accuracy and speed of all linear measurements with tape.
Instrumentman
Technician
Head Tapeman
Rear Tapeman
____________ a high-order survey primarily used to establish horizontal and/ or vertical monuments that serve as a reference for other surveys.
Cadastral Survey
Topographic Survey
Control Survey
Relocation Survey
____________ are done to relocate property or boundary lines previously surveyed.
Construction Survey
Topographic Survey
Control Survey
Retracement Survey
____________ are errors that occur in the same direction, thereby tending to accumulate.
Systematic Error
Accidental Error
Syntax Error
Blunder
____________ is the person whose duty is to set up, level and operate surveying instruments such as transit, theodolite, etc.
Instrumentman
Technician
Asst, Chief of Party
Rodman
____________ are mistakes that can usually be traced back to poor field procedures.
Systematic Error
Random Error
Syntax Error
Blunder
1. The goal of any measurement is to be as close to the actual truth as possible.
2. Accuracy checks should be made as soon as possible after the survey is completed, preferably before the surveying party leaves the site.
Both Statements are True
Both Statements are False
Statement 1 is True but Statement 2 is False
Statement 1 is False but Statement 2 is True
1. Measurement of a line with a tape of incorrect length is an example of a blunder.
2. Writing a different number or direction is an example of random error.
Both Statements are True
Both Statements are False
Statement 1 is True but Statement 2 is False
Statement 1 is False but Statement 2 is True
1. Every individual has the same pace factor.
2. The pace factor can be determined by dividing the actual distance with the average number of paces.
Both Statements are True
Both Statements are False
Statement 1 is True but Statement 2 is False
Statement 1 is False but Statement 2 is True
Kimmy wants to find out her pace factor. She measures a 150m line and traversed it for 5 trials. She got the following number of paces for each trial: 183, 184, 184.5, 186, and 185.
What is her pace factor?
Ans.: (a) m/pace
(Write only the number rounded off to the last 2 decimal places)
