wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Set 1

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

In this phase of the regular design service, the architect prepares the initial line drawings representing design studies that will lead to a recommended solution

a)

Project definition phase

b)

Schematic design phase

c)

Design development phase

d)

Predesign phase

2.

How many sets of drawings should the architect give to the client as part of the regular design service?

a)

3

b)

5

c)

7

d)

10

3.

In this phase, the architect consults with the owner to ascertain the conceptual framework and related requirements of the project and confirms such requirements with him.

a)

Project definition phase

b)

Consultation phase

c)

Schematic design phase

d)

Conceptual design phase

4.

What method of compensation is most suitable for compensating the Architect's services for the pre-design phase?

a)

multiple of direct personnel expense 

b)

 

lump sum or fixed fee

c)

 

per-diem plus reimbursable expenses

d)

 

professional fee plus expenses

5.

The act of conceiving, choosing and developing the type, disposition, arrangement and proportioning of the structural elements of an architectural work giving due consideration to safety, cost-effectiveness, functionality and aesthetics.

a)

structural designing

b)

structural work

c)

structural conceptualization 

d)

structural analysis

6.

Which is an unethical action with respect to the Architect's responsibility to his colleagues and subordinates?

a)

provides free professional service for a charitable project

b)

donates to obtain advantage in a religious project

c)

undertakes a commission from another Architect duly notified

d)

serving as professional adviser, accepts employment as Design Architect for a competition project. 

7.

What pre-design service involves investigating, identifying and documenting the needs of the client for use in the design of the project?

a)

Economic Feasibility Studies

b)

Space Management Studies

c)

 

Architectural Programming 

d)

 Site Selection and Analysis.

8.

What is the basic rate for the first 100 hectares or less for subdivision planning for housing on properties within Metro Manila, cities, regional centers and provincial capitals?

a)

P2,000.00 per hectare

b)

P3,000.00 per hectare  

c)

P4,000.00 per hectare

d)

P5,000.00 per hectare

9.

Traditional name for construction inspectors.

a)

clerk-of-works  

b)

maestro de obras

c)

contractor

d)

construction foreman

10.

A method of selection for an Architect most often used by an individual person undertaking a relatively small project

a)

comparative selection

b)

design competition

c)

bidding

d)

direct selection  

11.

A method of compensation that is flexible, easy to apply and is related to the size and the type of the project.

a)

multiple of direct personnel expense

b)

percentage of construction cost  

c)

professional fee plus expenses

d)

lump sum or fixed fee

12.

Most expensive and time-consuming method of selecting the Architect.

a)

comparative selection

b)

design competition  

c)

mixed method

d)

direct selection

13.

How are projects classified in determining the basis for the Architect's Basic Fee?

a)

material specifications

b)

relationship to the Client

c)

 

degree of project complexity  

d)

structural components

14.

Not included in the scope of services under Physical Planning.

a)

environmental studies

b)

impact analysis  

c)

examination of laws, ordinances, rules and regulations

d)

engineering drawings and specifications

15.

Which is prohibited in the practice of Architecture?

a)

a person claiming architectural work without using the title "Architect"  

b)

a person enticing a registered architect to first execute a written contract

c)

solicitation of architectural work by registered architects

d)

a government architect signing for architectural plans prepared under his supervision

16.

Duly notarized written contract or equivalent public instrument stipulating the scope of services and guaranteeing compensation of such services.

a)

service agreement

b)

general conditions

c)

Surety

d)

project manual

17.

What pre-design service involves investigating, identifying and documenting the needs of the client for use in the design of the project?

a)

Economic Feasibility Studies

b)

Space Management Studies

c)

Architectural Programming  

d)

Site Selection and Analysis

18.

In a typical owner-architect agreement, who is responsible for payment of surveys, soil explorations, and laboratory fees?

a)

Contractor

b)

Project Manager

c)

 Architect

d)

 Owner

19.

Comprehensive planning is one of the activities that fall under:

a)

Construction services

b)

Design services

c)

Specialized Allied services  

d)

Post Construction services

20.

What is the responsibility of the architect during the contract document phase of his services?

a)

Prepares documents for contracts letting/construction forms/abstract of bids

b)

Prepares design documents/construction drawings & specifications  

c)

Makes periodic site visits

d)

Certifies work progress to owner