NEW
Font size
WorksheetsSet 1
Total questions: 20
Worksheet time: 10mins
In this phase of the regular design service, the architect prepares the initial line drawings representing design studies that will lead to a recommended solution
Project definition phase
Schematic design phase
Design development phase
Predesign phase
How many sets of drawings should the architect give to the client as part of the regular design service?
3
5
7
10
In this phase, the architect consults with the owner to ascertain the conceptual framework and related requirements of the project and confirms such requirements with him.
Project definition phase
Consultation phase
Schematic design phase
Conceptual design phase
What method of compensation is most suitable for compensating the Architect's services for the pre-design phase?
multiple of direct personnel expense
lump sum or fixed fee
per-diem plus reimbursable expenses
professional fee plus expenses
The act of conceiving, choosing and developing the type, disposition, arrangement and proportioning of the structural elements of an architectural work giving due consideration to safety, cost-effectiveness, functionality and aesthetics.
structural designing
structural work
structural conceptualization
structural analysis
Which is an unethical action with respect to the Architect's responsibility to his colleagues and subordinates?
provides free professional service for a charitable project
donates to obtain advantage in a religious project
undertakes a commission from another Architect duly notified
serving as professional adviser, accepts employment as Design Architect for a competition project.
What pre-design service involves investigating, identifying and documenting the needs of the client for use in the design of the project?
Economic Feasibility Studies
Space Management Studies
Architectural Programming
Site Selection and Analysis.
What is the basic rate for the first 100 hectares or less for subdivision planning for housing on properties within Metro Manila, cities, regional centers and provincial capitals?
P2,000.00 per hectare
P3,000.00 per hectare
P4,000.00 per hectare
P5,000.00 per hectare
Traditional name for construction inspectors.
clerk-of-works
maestro de obras
contractor
construction foreman
A method of selection for an Architect most often used by an individual person undertaking a relatively small project
comparative selection
design competition
bidding
direct selection
A method of compensation that is flexible, easy to apply and is related to the size and the type of the project.
multiple of direct personnel expense
percentage of construction cost
professional fee plus expenses
lump sum or fixed fee
Most expensive and time-consuming method of selecting the Architect.
comparative selection
design competition
mixed method
direct selection
How are projects classified in determining the basis for the Architect's Basic Fee?
material specifications
relationship to the Client
degree of project complexity
structural components
Not included in the scope of services under Physical Planning.
environmental studies
impact analysis
examination of laws, ordinances, rules and regulations
engineering drawings and specifications
Which is prohibited in the practice of Architecture?
a person claiming architectural work without using the title "Architect"
a person enticing a registered architect to first execute a written contract
solicitation of architectural work by registered architects
a government architect signing for architectural plans prepared under his supervision
Duly notarized written contract or equivalent public instrument stipulating the scope of services and guaranteeing compensation of such services.
service agreement
general conditions
Surety
project manual
What pre-design service involves investigating, identifying and documenting the needs of the client for use in the design of the project?
Economic Feasibility Studies
Space Management Studies
Architectural Programming
Site Selection and Analysis
In a typical owner-architect agreement, who is responsible for payment of surveys, soil explorations, and laboratory fees?
Contractor
Project Manager
Architect
Owner
Comprehensive planning is one of the activities that fall under:
Construction services
Design services
Specialized Allied services
Post Construction services
What is the responsibility of the architect during the contract document phase of his services?
Prepares documents for contracts letting/construction forms/abstract of bids
Prepares design documents/construction drawings & specifications
Makes periodic site visits
Certifies work progress to owner
