wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

National Building Code Chapter 3 & 4

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

Who is responsible for issuing building permits?

a)

Property owners

b)

Government agencies

c)

The Building Official

d)

Construction companies

2.

No person, firm or corporation, including any agency or instrumentality of the government shall erect, construct, alter, repair, move, convert or demolish any building or structure or cause the same to be done without first obtaining a ____

a)

Building Permit

b)

Police Clearance

c)

Affidavit

d)

NBI Clearance

3.

How long does the applicant/permitee may file an appeal for the revocation of his building permit?

a)

30

b)

10

c)

20

d)

15

4.

When does a building permit become null and void according to the provided section?

a)

After one year from the date of issuance

b)

After 90 days from the date of issuance

c)

After 6 months from the date of issuance

d)

After 120 days from the date of issuance

5.

What can lead to the suspension or revocation of building permits?

a)

Incorrect weather conditions

b)

Delays in payment of fees

c)

Errors in plans and specifications

d)

Changes in ownership

6.

Who is responsible for the full-time inspection and supervision of construction work?

a)

A licensed architect or civil engineer

b)

The Building Official

c)

The property owner

d)

The contractor

7.

What materials are primarily used in Type III construction according to the provided section?

a)

Wood and concrete

b)

Steel and iron

c)

Masonry and wood

d)

Steel and concrete

8.

Under what circumstances can a change in the type of construction be approved by the Building Official?

a)

If the change results in a more hazardous construction

b)

If the change complies with the requirements for the new type of construction

c)

If the change is proposed by the contractor

d)

If the change involves a different type of material

9.

Which type of construction requires structural elements to be of steel, iron, concrete, or masonry?

a)

Type II

b)

Type IV

c)

Type I

d)

Type III

10.

Who is responsible for prescribing standards for each type of construction and promulgating rules and regulations?

a)

The Building Official

b)

The Secretary

c)

The Architect

d)

The Contractor