What is another name for a bottom plate?
termite shield
sole plate
sub-sill
ground plate
What are these?
king studs
headers
jack studs
studs
What type of a roof is this?
Gambrel
Gable
Hip
Shed
What type of a roof is this?
shed
hip
butterfly
gable
What is the minimum number of 10-ft pieces of #4 rebar needed to construct the concrete pad shown in the diagram?
(a)
Determine the volume (in cubic yards) of the concrete pad in the diagram if the pad is 3" thick. (Round to the nearest hundredth.)
0.44 yd3
0.59 yd3
16 yd3
48 yd3
When determining the approximate cost of a concrete pad, what are the components that must be considered for the total cost? Check all that apply.
Concrete
Leveling Sand
Rebar/Steel
Water
Wood Forms
What is this?
king stud
header
jack stud
top plate
Identify component #11 in the diagram. (Click on the diagram to enlarge the picture.)
Felt
Roof Sheathing
Shingles
Vapor Barrier
Identify component #9 in the diagram. (Click on the diagram to enlarge the picture.)
Felt
House Wrap
Roof Sheathing
Vapor Barrier
Identify component #8 in the diagram. (Click on the diagram to enlarge the picture.)
Insulation
Felt
Stud
Truss
Identify component #1 in the diagram. (Click on the diagram to enlarge the picture.)
Floor Joist
Sole Plate
Stud
Truss
What is the U-Factor of a double-glazed window that has a R-value of 1.67?
0.599
0.67
1.67
3.34
When calculating the total transmission load of a wall assembly, what is the value used for the change in temperature ( Δ T) if the outside temperature is 18 ° F and the desired temperature is 72 ° F?
(Just enter the number without any units)
(a)
Using the information in the chart, determine the total transmission load for the wall. (Round your answer to the nearest hundredth and do not enter in any units.)
Remember: Q′=UA(ΔT)
(a)