CCEW2024 Quiz

Total questions: 12

Worksheet time: 6mins

Name
Class
Date
1.

How many people missed the bus on the first day?

a)

2

b)

3

c)

4

d)

5

2.

What was the first estimate from Mission Analysis for the de-obit maneuver delta-V?

a)

100 m/s

b)

150 m/s

c)

200 m/s

d)

5 km/s

3.

What is the best way to model the 3D geometry of a CubeSat?

a)

Catia

b)

FreeCAD

c)

SolidWorks

d)

A mint box and two post-it notes

4.

What was the first estimate for the UHF Antenna mass?

a)

10 g

b)

20 g

c)

100 g

d)

336 kg

5.

What is the best way to collect inputs from the thermal design?

a)

Check values on COMET

b)

Implore other domains for the efficiency values

c)

Beg table by table

d)

Assume something

6.

When is the best time to choose a baseline propulsion system?

a)

At the beginning of the first iteration

b)

At the end of the first day

c)

18:00 on Thursday evening

d)

Never

7.

What was the final wet mass at the end of iteration 1 (Thursday evening)

a)

12.54 kg

b)

14.65 kg

c)

16.54 kg

d)

18.12 kg

8.

How many Element Definitions were created in COMET in total?

a)

28

b)

54

c)

74

d)

143

9.

What is VESNA designed to do?

a)

Observe distant galaxies

b)

Observe light emitted by plasma events

c)

Observe rainbows

d)

Observe wildlife

10.

What is the launch date of our mission?

a)

mid-2026

b)

late 2027

c)

early 2028

d)

mid-2029

11.

What is the period of our operational orbit?

a)

1.26 h

b)

1.41 h

c)

1.58 h

d)

1.73 h

12.

Finally, the biggest risk to our mission was:

a)

COMET crashes

b)

Excel Workbook edit permissions

c)

non-concurrent engineering

d)

all of the above