wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Testing and System Implementation

Total questions: 21

Worksheet time: 10mins

Name
Class
Date
1.

Testing is the process of concern with

a)

Directing

b)

Preparation

c)

Executing

d)

All True

2.

Testing can help to ....... the risk of failures

a)

Check

b)

Fix

c)

Reduce

d)

All True

3.

Objectives for Testing

a)

To Build Confidence

b)

Tp Prevent Defects

c)

To Provide Sufficient Information

d)

All True

4.

A process of finding, analysing and removing the causes of failures in software

a)

Testing

b)

Debugging

c)

Vaulting

d)

All True

5.

All activities that direct and  control  an  organisation  with  regard  to  quality  in  all  aspects

a)

Quality Management

b)

Quality Assurance

c)

Quality Control

d)

All True

6.

An imperfection or deficiency in a work product where it does not meet its requirements or specifications

a)

Error

b)

Failures

c)

Defect

d)

All True

7.

A human action that produces an incorrect result.

a)

Error

b)

Failures

c)

Defect

d)

Mistaken

8.

An event in which a component or system does not perform a required function within specified limits

a)

Error

b)

Failures

c)

Mistaken

d)

Defect

9.

Confirmation by examination and through the provision of objective evidence that specified requirements have been fulfilled.

a)

Confirmation

b)

Validation

c)

Verification

d)

All Wrong

10.

Confirmation by examination and through the provision of objective evidence that the requirements for a specific intended use or application have been fulfilled

a)

Confirmation

b)

Validation

c)

Verification

d)

Consolidation

11.

Documentation describing the test objectives to be achieved and the means and the schedule for completing them, organized to coordinate testing activities

a)

Test Design

b)

Test Monitoring

c)

Test Plan

d)

Test Execution

12.

A test management task that deals with developing and applying a set of corrective actions to get a test project on track when monitoring shows a deviation from what was planned

a)

Test Design

b)

Test Monitoring

c)

Test Plan

d)

Test Control

13.

A test management activity that involves checking the status of testing activities, identifying any variances from the planned or expected status and reporting status to stakeholders

a)

Test Design

b)

Test Monitoring

c)

Test Plan

d)

Test Control

14.

The process of running a test on the component or system under test and producing actual result(s)

a)

Test Execution

b)

Test Monitoring

c)

Test Plan

d)

All Wrong

15.

The activity that makes test assets available for later use, leaves test environments in a satisfactory condition and communicates the testing results to relevant stakeholders.

a)

Test Finishing

b)

Test Conclusion

c)

Test Completion

d)

All True

16.

A type of development life cycle model in which a complete system is developed in a linear way of several discrete and successive phases with no overlap between them

a)

Sequential Development Model

b)

SDLC Model

c)

Satzinger Model

d)

All True

17.

Start with a rough product, and the final version is only delivered to the customer (although in practice, intermediate versions may be delivered to selected customers to get feedback).

a)

Kanban Model

b)

Incremental Development Model

c)

Iterative Development Model

d)

All True

18.

Complete one piece at a time (scheduling or staging strategy). Each piece may be delivered to the customer

a)

Kanban Development Model

b)

Incremental Development Model

c)

Iterative Development Model

d)

Lean Development Model

19.

What is the Type of Development Model (see the picture)

a)

RUP

b)

Iterative Model

c)

Incremental Model

d)

All Wrong

20.

What is the Type of Development Model (see the picture)

a)

RUP

b)

Iterative Model

c)

Incremental Model

d)

All True

21.

Part of SDLC Model on using Incremental Process

a)

Scrum 

b)

Kanban

c)

Rational Unified Process (RUP)

d)

Spiral (or prototyping)