WorksheetsLDSP ORIENTATION QUIZ
Total questions: 15
Worksheet time: 3mins
ANO ANG TAWAG SA FORM NA ISINA-SUBMIT PARA SA PAGREQUEST NG KONTRATA SA LDSP?
A. RMTP
B. RNTP
C. RTNP
D. RFCA
CATEGORY: BILLING
UPANG MAI-BILL ANG MGA NAGING ACCOMPLISHMENTS NI CONTRACTOR, MARAPAT
LAMANG NA MAI-SUBMIT SA TAKDANG ARAW AT ORAS SA ATING PSD ENGINEER
ANG MGA SUPPORTING DOCUMENTS KAUGANAY NITO.
TUWING KAILAN ANG CUTOFF NG BILLING SUBMISSION NI SITE?
A. THURSDAY,
ON OR BEFORE 5 PM
B. FRIDAY,
ON OR BEFORE 5 PM
C. THURSDAY,
ON OR BEFORE 12 NN
D. FRIDAY,
ON OR BEFORE 12 NN
ILAN ANG RCP OFFSET FROM PROPERTY LINE KUNG ANG WIDTH NG RIGHT OF WAY AY 8 METERS?
A. 2.00 M
B. 1.00 M
C. 1.25 M
D. 0.9 M
CATEGORY: EARTHWORKS
SA MGA AREA NA TATAMBAKAN, KAILANGAN NA ICOMPACT ANG BAWAT LAYER NG
PANAMBAK BAGO PA MAN MAGPATULOY SA SUSUNOD NA LAYER. ANG COMPACTION AY
ISINASAGAWA KADA ILANG CENTIMETER NA KAPAL NG LOOSE FILL?
A. 30 cm
B. 25 cm
C. 20 cm
D. 75 cm
CATEGORY: DRAINAGE WORKS
ALIN SA MGA SUMUSUNOD ANG TAMANG OFFSET DISTANCE NG ATING MANHOLE
MULA SA KATABING PROPERTY?
A. 1.0 m
B. 0.75 m
C. 0.90 m
D. 1.25 m
CATEGORY: DRAINAGE WORKS
SA PAGLALATAG NG RCP, DAPAT NA SIGURADUHIN NA ANG TONGUE NG RCP AY HINDI
NAKAHARAP SA DIREKSYON NG FLOW
TAMA
MALI
PWEDE
CATEGORY: DRAINAGE WORKS
MATAPOS ILATAG ANG RCP, KAILANGANG MAG-BACKFILL SA MAGKABILANG
GILID NG RCP. HANGGANG ILANG PERCENT NG DIAMETER NG RCP
ANG DAPAT NAKA EXPOSE?
A. 65%
B. 80%
C. 70%
D. 75%
ANONG SIZE NG RCP MAGSISIMULA ANG PAGLALAGAY NG COLLARING
SA LOOB AT LABAS NG PIPE?
375 mm ABOVE
450 mm ABOVE
750 mm ABOVE
900 mm ABOVE
CATEGORY: WATERLINE WORKS
PARA SA MGA TUBONG DADAAN SA LOOB NG MANHOLE, ANG PAGLALAGAY
NG COVERING O CASING AY DAPAT NA ISINASAGAWA. ANO ANG RECOMMENDED
SIZE NG CASING NA ITO?
0.50 PIPE SIZE HIGHER
1 PIPE SIZE HIGHER
1.50 PIPE SIZE HIGHER
2 PIPE SIZE HIGHER
CATEGORY: ROADWORKS
ILANG ARAW ANG DAPAT ANTAYIN MATAPOS ANG BUHOS (ROAD CONCRETING) BAGO
TANGGALIN ANG PORMA?
A. 1 TO 2 DAYS
B. 2 TO 3 DAYS
C. 3 TO 4 DAYS
D. 4 TO 5 DAYS
CATEGORY: ROADWORKS
ALIN SA MGA SUMUSUNOD ANG DESIRED DEPTH AND WIDTH SA PAGSASAGAWA
NG CONCRETE CUTTING SA ATING MGA KAKALSADAHAN?
A. 1" X 1/8"-5/16"
B. 1" X 1/8"-3/16"
C. 2" X 1/8"-5/16"
D. 2" X 1/8"-3/16"
CATEGORY: ROADWORKS
ILANG BESES AT HANGGANG ILANG ARAW DAPAT DILIGAN ANG KALASADANG BAGONG BUHOS?
A. AT LEAST ONCE A DAY FOR 7 DAYS
B. AT LEAST ONCE A DAY FOR 5 DAYS
C. AT LEAST THRICE A DAY FOR 7 DAYS
D. AT LEAST THRICE A DAY FOR 5 DAYS
CATEGORY: DAILY ACCOMPLISHMENT LOG
SAANG SHEET SA ATING DAL INILALAGAY ANG EUR?
A. SHEET 4
B. SHEET 7
C. SHEET 10
D. SHEET 13
CATEGORY: PERIMETER FENCE
ANONG DOKUMENTO ANG KAILANGAN NA MAIHANDA BAGO MAGSAGAWA NG
FIRST CONCRETING SA PERIMETER FENCE?
SURVEY TURNOVER FORM NA MAY REMARKS NA "RESURVEY FOR 1ST CONCRETE POURING"
MAPOUT
RFI
BOM
ITO AY KAILANGANG ISAGAWA KUNG ANG PERIMETER FENCE ACCOMPLISHMENT
AY UMABOT NA SA FINISH GRADE ELEVATION.
A. CONCRETING
B. CHB LAYING
C. BACKFILLING
D. FORMWORKS