Semi Rigid Quiz

Total questions: 3

Worksheet time: 2mins

Name
Class
Date
1.

The followings are the quality of blocks produced EXCEPT

a)

Curing method

b)

Grade of bitumen used

c)

Level of supervision and workmanship

d)

Additives used

2.

Identify the laying pattern

a)

Stretcher bond

b)

Stack bond

c)

Basket weave

d)

Herringbone

3.

What is the 7th process of block pavement construction

a)

Provision and compaction of coarse bedding sand

b)

Laying of blocks and interlocking

c)

Leveling and compaction of subgrade, subbase and roadbase

d)

Application of joint sealing sand and compaction

e)

Installation of edge restraints