Electrical Engineering Quiz 3

Total questions: 16

Worksheet time: 1hrs 20mins

Name
Class
Date
1.

List three things that need to be checked regarding the materials, given on a material schedule, before they are obtained and installed.

a)

Color, size, and price

b)

Durability, availability, and cost

c)

Quality, compatibility with the project, and environmental impact

d)

Weight, texture, and fire resistance

2.

List three methods of generating electricity using renewable energy.

a)

Solar, Wind, and Hydroelectric

b)

Coal, Natural Gas, and Nuclear

c)

Biomass, Geothermal, and Tidal

d)

Oil, Peat, and Diesel

3.

Explain one reason why AC is used in preference to DC for most electrical distribution in the UK.

a)

AC can be easily converted to different voltages using transformers

b)

DC is more efficient than AC

c)

AC is more expensive than DC

d)

DC is safer to transmit over long distances

4.

List three types of AC motor controller.

a)

Soft start, Rotor resistance, Direct online

b)

Pulse-width modulation, Voltage controller, and Slip ring induction

c)

Direct torque control, Slip ring induction, and Synchronous motors

d)

Frequency converter, Pulse-width modulation, and Brushless DC

5.

Determine the neutral current within a three-phase circuit where the current for each phase is L1 = 80 A, L2 = 60 A and L3 = 40 A.

a)

36 A

b)

40A

c)

42A

d)

38A

6.

Why must electric immersion heaters in hot water cylinders have a thermal cut-out within?

a)

To prevent the water from freezing

b)

To regulate the water temperature for energy efficiency

c)

To prevent the water from overheating and potentially causing damage or injury

d)

To monitor the water level in the cylinder

7.

List three different devices that can provide overcurrent protection.

a)

Fuse, Circuit Breaker, Ground Fault Circuit Interrupter

b)

Resistor, Capacitor, Inductor

c)

Transistor, Diode, Transformer

d)

Voltage Regulator, Amplifier, Oscillator

8.

Explain why an IT earthing arrangement may be selected for an installation.

a)

It provides enhanced safety for people and equipment.

b)

It is the most cost-effective earthing arrangement.

c)

It is the only earthing arrangement allowed by regulations.

d)

Where unexpected disconnection of a circuit could cause danger

9.

Explain why three-phase motor circuits do not usually include a neutral conductor.

a)

Because all three phases are balanced there will be no neutral current and thus a conductor is not required. 

b)

Due to the high cost of additional wiring for the neutral conductor.

c)

Neutral conductors are only omitted in single-phase circuits, not three-phase circuits.

d)

It is a common misconception; three-phase motor circuits always include a neutral conductor.

10.

List, in the correct order, the first three tests to be performed during the initial verification of a new radial final circuit in accordance with BS 7671.

a)

Continuity of conductors, insulation resistance, polarity

b)

Insulation resistance, continuity of conductors, polarity

c)

Polarity, insulation resistance, continuity of conductors

d)

Continuity of conductors, polarity, insulation resistance

11.

Which of the following is an example of how the sense of touch could be used during an inspection of a metallic conduit system?

a)

To detect the presence of irregularities or damage on the surface

b)

To measure the temperature of the conduit

c)

To determine the electrical conductivity of the conduit

d)

To identify the color of the conduit

12.

What is verified during the functional test of a passive infrared movement detector controlling a number of outdoor luminaires?

a)

The color temperature of the luminaires

b)

The detection range and responsiveness

c)

The waterproof rating of the detector

d)

The energy consumption of the luminaires

13.

Which of the following is NOT a GS38 requirement for an approved voltage indicator used to safely isolate a circuit prior to fault diagnosis?

a)

Must have a fuse in the probe

b)

Should include a means of testing the operation of the device before and after use

c)

Must be able to operate without a battery

d)

Should have a retractable shroud over the probe tips

14.

State two sources for safety services as given in BS 7671.

a)

Storage batteries

b)

Primary cells

c)

Generators

d)

Separate feeder

15.

State the minimum degree of IP protection for each zone in a location containing a bath.

a)

Zone 2 - IPX4

b)

Zone 1 - IPX4

c)

Zone 0 - IPX7

16.

Explain where, within an installation, surge protective devices may be required.

a)

At the main electrical service entrance

b)

Near sensitive electronic equipment

c)

At branch circuits

d)

All of the above