1.

What is the process of translating the functional architecture into a Physical Architecture?

a)

Validation

b)

Design Synthesis

c)

Modelling

d)

Verification

2.

Which tool is a traditional logical prototyping tool for Design Synthesis?

a)

Computer-Aided Engineering (CAE)

b)

Computer-Aided Systems Engineering (CASE)

c)

Schematic Block Diagrams (SBD)

d)

Computer-Aided Design (CAD)

3.

What is the purpose of Verification activities?

a)

To confirm that operational requirements are met for the overall system

b)

To ensure that the final product meets user needs and expectations

c)

To determine if a system meets its system-level requirements

d)

To predict the compliance of a design to its requirements

4.

How does Requirements Allocation Sheets (RAS) contribute to system design?

a)

By defining the system architecture in detail

b)

By allocating system requirements to subsystems and components

c)

By conducting trade studies for design options

d)

By creating a physical layout of system components

5.

What is the purpose of a (WBS)?

a)

Break down a project into manageable tasks

b)

Design the system architecture

c)

Track system performance metrics

d)

Develop mathematical models of a system

6.

What is the primary purpose of system analysis?

a)

Fix existing problems in a system

b)

Identify and define the requirements of a system

c)

Develop the user interface for a system

d)

Optimize system performance

7.

What does Configuration Management ensure?

a)

The system has a user-friendly interface

b)

The system operates efficiently under all conditions

c)

The correct versions of system components are used

d)

The system meets its functional requirements

8.

What is the purpose of control metrics in system analysis and control?

a)

Measure how well a system is being controlled

b)

Make data-driven decisions

c)

Measure how well a system is achieving its objectives

d)

Track progress and identify areas for improvement

9.

Which step in the Risk Management Process involves identifying, analyzing, prioritizing, and mitigating possible risks?

a)

Risk Avoidance

b)

Risk Acceptance

c)

Risk Sharing

d)

Risk Mitigation / Reduction

10.

What is the purpose of a Gantt chart in project management?

a)

Track system performance metrics

b)

Visualize project schedule and dependencies

c)

Design the system user interface

d)

Develop mathematical models of a system

11.

How does a project manager ensure effective communication within a project team?

a)

By avoiding all risks

b)

By sharing all risks equally

c)

By establishing clear channels and protocols

d)

By reducing all risks to a minimum

12.

How does a project manager ensure stakeholder engagement in a project?

a)

By avoiding all risks

b)

By sharing all risks equally

c)

By establishing clear communication channels

d)

By reducing all risks to a minimum

13.

What is the main aspect of configuration management?

a)

Identification of configurable items

b)

Labelling of configurable items

c)

Protection of configurable items

d)

Keeping of baseline and other information

14.

Which of the following is a key aspect of system analysis?

a)

System Design

b)

System Behavior

c)

System Configuration

d)

System Programming

15.

What is a crucial element of system analysis?

a)

System Development

b)

System Evaluation

c)

System Implementation

d)

System Configuration

16.

What is the purpose of system analysis?

a)

System Development

b)

System Evaluation

c)

System Implementation

d)

System Configuration

17.

Which term is used to describe the process of organizing and managing system behavior to achieve desired outcomes?

a)

System Analysis

b)

Control Systems

c)

Configuration Identification

d)

System Management

18.

It is a visual tool used in project management to define and organize the tasks, deliverables, and activities required to complete a project.

a)

Work Breakdown Structure (WBS)

b)

Configuration Management (CM)

c)

Modeling & Simulation (M&S)

d)

Project Assessment Tracking (PAT)

19.

These are procedures or processes that regulate and manage system behavior in order to accomplish the expected outcomes.

a)

System Analysis

b)

Control Systems

c)

Configuration Identification

d)

System Management

20.

_______ Analysis involves studying a system's components, interactions, and processes to better understand how it works and how it may be improved.

a)

System

b)

Procedure

c)

Configuration

d)

Testing

21.

What is the function of management that entails establishing goals and devising a strategy to achieve them?

a)

Risk Management

b)

Quality Assurance

c)

Planning

d)

Data Accuracy

22.

What is the set of principles relating to POLICE (planning, organizing, leading, improving, controlling, and evaluating) to achieve organizational goals?

a)

Risk Management

b)

Planning

c)

Management

d)

Quality Assurance

23.

What is the process of making changes to an existing product or system to optimize it further in terms of effectiveness and efficiency?

a)

Scalability

b)

Risk Management Plan

c)

Functional Improvement

d)

Product Improvement

24.

What is the primary focus of Configuration Management in product development?

a)

To manage project risks

b)

To control changes to project artifacts

c)

To ensure data accuracy

d)

To improve product scalability

25.

What is the key objective of Quality Assurance in software development?

a)

To ensure compliance with industry standards

b)

To identify and fix defects in the code

c)

To manage project resources effectively

d)

To enhance user experience and satisfaction

26.

What is the function of management that involves establishing goals and devising a strategy to achieve (a)   ?

27.

What is the process of ensuring that a system satisfies the predetermined quality requirements?

(a)  

28.

BONUS! FAVORITE COLOR KO?

(a)