WorksheetsLoading, Teaching and Describing Quiz
Total questions: 28
Worksheet time: 14mins
When do you log into J2 for the job that is going to be completed next?
Before starting the next job
When should you compare the current job/old job sheet to the new job setup sheet?
Without comparing the sheets just load the machine
Before starting the new job preview the setup sheet to keep all repeat tools in the machine
When should you verify that the tooling & work holdings required for the next job are All in the green bin?
At the end of the day when you clock out
When the supervisor asks or when its a hot order
Before starting the next job to verify what is needed and what is not for the next job.
When should you Load the program onto the USB to verify that it is available?
Prior to setting up the job to verify the program is available
After you have already used it and need to reload it
Only on weekends or afternoon
When do you Delete tooling descriptions in the tool DATA section that will NOT be used in the next job setup?
After completing the next job setup so you can load the turret immediately
During the next job setup so it runs faster and produces parts
Before starting the next job setup so you don't get confused on what needs to be loaded
When would you remove all non-standard tooling (if there is any that is NOT being used for the next job)?
Before starting the next job and loading the tooling into the foam holder
During the next job so the process runs faster
After completing the previous job and before starting the next job so they can be placed into the black box
When should you Place all (Non-Standard) bushings and collets in the black return box?
When they are not being used or after completing a job
When should you place all (Standard) bushings and collets in the foam holder located on the workbench?
When would you remove all KM quick-connect tooling and return it to the KM storage area?
When would you remove all (Non-Standard) inserts from tools and place them in the yellow envelopes marked with the KLI-number for the insert?
When would you return ALL (TAP) Collets to the cabinet in the designated location?
Once all tools and inserts have been removed from the turret and placed into the (black box); what does the operator do with the setup sheet?
Place the setup sheet into the black box.
When should you place all gages from the previous job in the yellow bin on the tooling cart?
When do you fill out a green Parts Identification tag with the job number and parts number?
When working on a specific job and needing to keep track of the parts machined
How do you select a parts container of an appropriate size to place conforming parts?
What do you do prior to installing any of the tooling or inserts?
What should every operator be conscious of when Loading tooling into the turret?
What is the proper way to tighten ER collets?
What is the correct way to load the program for the next job?
How do you verify that the program does match with the setup sheet?
How do you Verify the material being used for the job?
If authorized to continue the process what should the operator do on J2?
Before teaching or describing a tool what should the operator do?
Calibrate the machine and confirm on the control panel.
Adjust the machine settings and check on the control panel.
Home the machine out and verify it on the position screen
Set up the machine and validate on the control panel.
What should the operator utilize to describe tools in the tool data page?
With all pertinent information from the setup sheet
What should the operator do to ensure the workpiece is held by the chuck?
What should an operator do to ensure the jaws are capable of holding the workpiece?
How does an operator teach their tool offsets?
How does the operator make sure that the program runs correctly with the tool information that was entered?