wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Prof. Prac. Part 2

Total questions: 100

Worksheet time: 50mins

Name
Class
Date
1.

What is the Professional Regulatory Board of

Architecture resolution amending earlier

resolutions regarding Code of Ethical Conduct for

Registered and Licensed Architects?

a)

No.2 Series of 2018

b)

No.2 Series of 2006

c)

No.5 Series of 2018

d)

No.5 Series of 2017

2.

The latest version of the Architects Credo was

endorsed by UAP through NBD Board Resolution

No. _____ series of 2017-2018.

a)

99

b)

5

c)

2

d)

89

3.

The architect's credo clearly states that is the

architect's duty to protect our common

environment and to preserve the _______ for the

sake of the present and future generations.

a)

Architectural heritage

b)

Filipino culture

c)

Architecture profession

d)

World

4.

For the architect's ethical relationship, what

sector or group of people that has NOT been

mentioned?

a)

Colleagues

b)

Industry partners

c)

Clients

d)

Government

5.

The latest architect's credo took effect on ____.

a)

June 21, 2017

b)

May 4, 2006

c)

May 4, 2018

d)

June 21, 2018

6.

Approved form of security furnished by the

contractor as a guarantee to execute work in

accordance with terms of the contract.

a)

Performance

b)

Guarantee bond

c)

Surety bond

d)

Contractors bond

7.

What should be provided first before rendering a

service to a client?

a)

Service agreement

b)

Sketches

c)

Contract agreement

d)

Design concept

8.

The amount retained by the owner shall be

released how many months after the date of the

final payment?

a)

2 months

b)

1 month

c)

3 months

d)

15 days

9.

Which is not included in the first page of

Architectural Plans submitted in acquiring

Building Permit?

a)

Site Development

b)

Vicinity Plan

c)

Perspective

d)

Roof Plan

10.

What type of permit is secure after the building

construction is completed and after the owner can

move in?

a)

Building permit

b)

Certificate of completion

c)

Occupancy permit

d)

Completion permit

11.

Type of plan that contractor should submit to

building official after completion of construction?

a)

Completion permit

b)

As built plan

c)

Shop drawings

d)

Occupancy permit

12.

How many months is the retention months

where contractor should do defects after turn-over

of construction

a)

2 months

b)

1 month

c)

3 months

d)

15 days

13.

Which of the following is not a referral code of

the National Building Code?

a)

Philippine Electrical Code

b)

National Structural Code of the Philippines

c)

National Plumbing Code of the Philippines

d)

Civil Code of the Philippines

14.

What government agency appoints the

Building Official of a highly urbanized city?

a)

DPWH

b)

Office of President

c)

DOTR

d)

DENR

15.

After how many years can a newly passed

Architect sign the ALE aspirants as a mentor?

a)

2 years

b)

3 years

c)

4 years

d)

5 years

16.

When was the Code of Ethical Conduct for

Registered and Licensed Architect as well as for

holders of Temporary Special Permit

promulgated?

a)

2004

b)

1978

c)

2006

d)

2010

17.

The New Methods of Compensation that forms

part of the Standards of Professional Practice was

approved by the Professional Board of

Architecture (PRBOA) and took effect in:

a)

2015

b)

2016

c)

2017

d)

2010

18.

Under the new Methods of Compensation

under the Standards of Professional Practice, the

architect is paid based on the Percentage of

Project Cost. If the Architect will include all allied

professionals under his contract, this will fall under

DAEDS. What does DAEDS stands for?

a)

Detailed Architectural and Engineering

Submission

b)

Detailed Arts and Educational System

c)

Detailed Architectural and Engineering Design

Services

d)

Detailed Architects and Engineers Submission

19.

As per the LGU code the maximum a

professional can pay his Community Tax

Certificate (CEDULA) is how much?

a)

P 5, 000.00

b)

P 100.00

c)

P 20.00

d)

P 1, 000.00

20.

Which among the choices should have the

highest weight in relation to the architects

responsibility to the people?

a)

Respect and conserve the environment

b)

Promote the interest of the his/her professional

organization

c)

Do not deceive the public

d)

All of the above

21.

In relation to the architects responsibility to the

client, which among the choices should the

architect not heed?

a)

Give the client an overview of the project

b)

To give assurance of the cost of the project

c)

Protect the clients interest

d)

To keep the client informed at all times

22.

In preparation of the contract documents, the

architect should always consider and include in

the contract the following provisions except one:

a)

Negotiation

b)

Mediation

c)

Arbitration

d)

Out of court settlement

23.

The architect may prepare and come up with

the Project Construction Cost through the

following estimate technique except:

a)

Area Method

b)

Detailed estimate

c)

Volume method

d)

Interest rate method

24.

What is the suitable estimate technique during

the Project definition and Schematic Design Phase

of the Project?

a)

Area Method

b)

Detailed estimate

c)

Volume method

d)

Interest rate method

25.

In RA 9266, it refers to an actor behavior that

gravely violates the sentiment or accepted

standards of the community?

a)

Moral authority

b)

Moral behavior

c)

Moral turpitude

d)

NOTA

26.

In labor-materials ratio, what is the most

common ratio used in the Philippine setting in

coming out with an estimate?

a)

70-30%

b)

80-20%

c)

65-35%

d)

Depends on the contractor

27.

Which among the following is not an ASEAN

country?

a)

Philippines

b)

Singapore

c)

Thailand

d)

Nepal

28.

APEC architects can practice architecture

within the APEC member countries except one

a)

Canada

b)

New Zealand

c)

Peru

d)

Bolivia

29.

Who was the first ASEAN and APEC Filipino

Architect?

a)

Prosperidad Luis

b)

Yolanda Reyes

c)

Armando Alli

d)

Robert Sac

30.

When was the first conferment of title APEC

architects made?

a)

2000

b)

2006

c)

2010

d)

2017

31.

A ceased and desist order is issued by the office

of the building official on any construction activity

upon the issuance of:

a)

First Notice

b)

Second Notice

c)

Third Notice

d)

Forth Notice

32.

What is to be secured first before excavation for

a basement?

a)

Building permit

b)

Enclosure permit

c)

Excavation permit

d)

Hauling permit

33.

How many days is the issuance of building

permit after submitting the plans?

a)

30 days

b)

20 days

c)

15 days

d)

10 days

34.

As per the code, what is the height of electrical

outlet?

a)

0.30m

b)

0.35m

c)

0.25m

d)

0.45m

35.

Due to your excitement at being a new

Architect, you misplaced your PRC Identification

Card. You applied at PRC for a replacement ID.

How long will you wait to get you ID Card?

a)

1 week

b)

1 day

c)

1 month

d)

1 Year

36.

To get a replacement of PRC ID, you need to

pay Php 250.00 and present your ____?

a)

Special Power of Attorney

b)

4 pcs. 2 × 2 picture

c)

Affidavit of Loss

d)

Community Tax Certificate

37.

Three years after passing the board

examination, you will renew your PRC license. How

many CPD units is need?

a)

20 units

b)

100 units

c)

45 units

d)

60 units

38.

As an Architect, you have a responsibility to

your staff and fellow architect. Which of the

following would you best do show this?

a)

Train them to be good in their profession

b)

Be an example on how to become a good

professional

c)

Give them overtimes

d)

Give them good salary

39.

As an Architect, how do you compensate your

subordinates?

a)

Provide good workplace/environment

b)

Provide salary commensurate to work

c)

Provide minimum wage

d)

Set an example/ be a mentor

40.

For registration of architectural corporation,

where would you go first?

a)

SEC

b)

DIT

c)

City Hall

d)

PRC

41.

If planning to set a corporation before going to

SEC where should you get an endorsement?

a)

PRC

b)

DTI

c)

City Hall

d)

SEC

42.

Approved form of security furnished by the

contractor as a guarantee to execute work in

accordance with terms of the contract.

a)

Performance

b)

Surety

c)

Guarantee

d)

Contractors

43.

What should be provided first before rendering

a service to a client?

a)

Service agreement

b)

Contract agreement

c)

Sketches

d)

Design concept

44.

The amount retained by the owner shall be

released how many months after the date of the

final payment?

a)

2 months

b)

1 month

c)

3 months

d)

15 days

45.

Which is not included in the first page of

Architectural Plans submitted in acquiring

Building Permit?

a)

Site Development

b)

Perspective

c)

Vicinity Plan

d)

Roof Plan

46.

What type of permit is secure after the building

construction is completed and after the owner can

move in?

a)

Building permit

b)

Occupancy permit

c)

Certificate of completion

d)

Completion permit

47.

Type of plan that contractor should submit to

building official after completion of construction?

a)

Completion permit

b)

As built plan

c)

Shop drawings

d)

Occupancy permit

48.

How many months is the retention months

where contractor should do defects after turn-over

of construction

a)

2 months

b)

1 month

c)

3 months

d)

15 days

49.

Under the firm's set-up, who will be in charged

of signing the plans and related documents?

a)

Principal Architect

b)

Junior Architect

c)

Apprentices

d)

NOTA

50.

The Junior Architect was under the instruction

to follow the regulation of C-1 development

regulations on parking, where should the parking

not be located?

a)

Rear

b)

Front

c)

Side

d)

Basement

51.

As deadlines are important, a calendar day

means?

a)

Does not include Sundays and Holidays

b)

Includes only regular working days

c)

Includes all days, including Sundays and

Holidays

d)

Holidays only

52.

To whom the Junior Architect will be

responsible if there will be errors found on the

plans he heads to produced?

a)

Client

b)

Principal Architect

c)

Building Official

d)

The Firm

53.

If the apprentices, wishes to have their logbook

for their ALE, who will sign as the mentor?

a)

Principal Architect

b)

Their immediate boss, the Junior Architect

c)

The Firm

d)

The Client

54.

What Design code should the design team first

consider in the plan preparation which is critical in

the application of the Building Permit?

a)

National Building Code

b)

Fire Code of the Philippines

c)

PD 957

d)

BP 344

55.

Which of the following is not a referral code of

the National Building Code?

a)

Philippine Electrical Code

b)

National Structural Code of the Philippines

c)

National Plumbing Code of the Philippines

d)

Civil Code of the Philippines

56.

What government agency appoints the

Building Official of a highly urbanized city?

a)

DPWH

b)

DOTR

c)

Office of the Executive Secretary

d)

Office of the President

57.

After how many years can a newly passed

Architect sign the ALE aspirants as a mentor?

a)

2 years

b)

3 years

c)

4 years

d)

NONE

58.

The "Project Proponent" can be understood as

the

a)

Contractor

b)

Architect

c)

Client

d)

Builder

59.

In small scale projects, Clerk-of-work are

commonly referred to as the:

a)

Architect

b)

Apprentice

c)

Foreman

d)

Construction Manager

60.

Contract documents should be signed in how

many copies by both the contractor and the client

duly witnessed?

a)

Duplicate

b)

Triplicate

c)

Quintuplicate

d)

Xeroxed copies

61.

Shop drawings are prepared by the Contractor

to be approved by the architect. Who checks the

accuracy of the sub-contractors shop drawings?

a)

Architect

b)

Contractor

c)

Owner

d)

Construction Manager

62.

When was the Code of Ethical Conduct for

Registered and Licensed Architect as well as for

holders of Temporary Special Permit

promulgated?

a)

2004

b)

1978

c)

2006

d)

2010

63.

The New Methods of Compensation that forms

part of the Standards of Professional Practice was

approved by the Professional Board of

Architecture (PRBOA) and took effect in:

a)

2015

b)

2016

c)

2017

d)

2010

64.

Under the new Methods of Compensation

under the Standards of Professional Practice, the

architect is paid based on the Percentage of

Project Cost. If the Architect will include all allied

professionals under his contract, this will fall under

DAEDS. What does DAEDS stands for?

a)

Detailed Architectural and Engineering

Submission

b)

Detailed Arts and Educational System

c)

Detailed Architectural and Engineering Design

Services

d)

Detailed Architects and Engineers Submission

65.

If the client elects not to include the allied

engineers services on the architects contract, who

will be over-all coordinator of the engineers work?

a)

Client

b)

Civil Engineer

c)

Architect

d)

Project Manager

66.

For simple projects under the New Methods of

Compensation under the Standards of

Professional Practice shall be charged by much if

the project is less than 50M?

a)

5%

b)

6%

c)

7%

d)

8%

67.

Architect Baking was commissioned to design

a Residential Project under Detailed Architectural

Design Service (DADS), how much is the

professional fee of the architect if the project cost

is Ten Million pesos?

a)

1,000,000

b)

900,000

c)

500,000

d)

600,000

68.

The client of Arch. Baking decided eventually

to award and include the Engineering disciplines

to the firm, how much professional fee should

Arch. Baking now charged?

a)

1,000,000

b)

1,200,000

c)

500,000

d)

1,500,000

69.

In a renovation project, what is the first

obligation, the architect must perform?

a)

Prepare the feasibility study

b)

Apply for a permit

c)

Notify the previous architect involved

d)

Prepare and present schemes

70.

A CLIENT HIRES

ARCHITECT REYES IN DESIGN BUILD BY

ADMINISTRATION PROJECT OF A REST

HOUSE BUNGALOW LOCATED IN THE

MOUNTAINSIDE, 60 KM AWAY FROM

THE MUNICIPAL HALL. ARCHITECT

REYES PREPARED HIS TEAM AND

STARTED WORKING ON THE PROJECT

IMMEDIATELY.

How much should be the down payment of

the client to Arch. Reyes?

a)

30% of the contract

b)

10% of Project cost

c)

50%

d)

No down payment should be given

71.

A CLIENT HIRES

ARCHITECT REYES IN DESIGN BUILD BY

ADMINISTRATION PROJECT OF A REST

HOUSE BUNGALOW LOCATED IN THE

MOUNTAINSIDE, 60 KM AWAY FROM

THE MUNICIPAL HALL. ARCHITECT

REYES PREPARED HIS TEAM AND

STARTED WORKING ON THE PROJECT

IMMEDIATELY.

Who will apply for a building permit on this

project?

a)

Arch. Reyes

b)

Client

c)

No building permit is required, too far from the

Municipal Hall

d)

Rest houses are exempted

72.

A CLIENT HIRES

ARCHITECT REYES IN DESIGN BUILD BY

ADMINISTRATION PROJECT OF A REST

HOUSE BUNGALOW LOCATED IN THE

MOUNTAINSIDE, 60 KM AWAY FROM

THE MUNICIPAL HALL. ARCHITECT

REYES PREPARED HIS TEAM AND

STARTED WORKING ON THE PROJECT

IMMEDIATELY.

How much professional fee is the architect

entitled?

a)

10% plus 7% for Design Build

b)

10%

c)

Design fee of 10% plus 7% of DB and

reimbursable expenses

d)

Depends on the agreement

73.

A CLIENT HIRES

ARCHITECT REYES IN DESIGN BUILD BY

ADMINISTRATION PROJECT OF A REST

HOUSE BUNGALOW LOCATED IN THE

MOUNTAINSIDE, 60 KM AWAY FROM

THE MUNICIPAL HALL. ARCHITECT

REYES PREPARED HIS TEAM AND

STARTED WORKING ON THE PROJECT

IMMEDIATELY.

Under the Design-Build on guaranteed

maximum cost, if the guaranteed maximum cost

is exceeded by 10%, the extra cost exceeding the

10% shall be shouldered by whom?

a)

Architect

b)

60-40 sharing in favor of the client

c)

Client

d)

50-50 sharing

74.

A CLIENT HIRES

ARCHITECT REYES IN DESIGN BUILD BY

ADMINISTRATION PROJECT OF A REST

HOUSE BUNGALOW LOCATED IN THE

MOUNTAINSIDE, 60 KM AWAY FROM

THE MUNICIPAL HALL. ARCHITECT

REYES PREPARED HIS TEAM AND

STARTED WORKING ON THE PROJECT

IMMEDIATELY.

All receipts under Design-Build Project shall be

under the name of whom?

a)

Client

b)

Architect

c)

Accountant

d)

Doesn't Matter

75.

A CLIENT HIRES

ARCHITECT REYES IN DESIGN BUILD BY

ADMINISTRATION PROJECT OF A REST

HOUSE BUNGALOW LOCATED IN THE

MOUNTAINSIDE, 60 KM AWAY FROM

THE MUNICIPAL HALL. ARCHITECT

REYES PREPARED HIS TEAM AND

STARTED WORKING ON THE PROJECT

IMMEDIATELY.

Who keeps the record of the project?

a)

Timekeeper

b)

Foreman

c)

Both Architect and Client

d)

Project Supervisor

76.

A CLIENT HIRES

ARCHITECT REYES IN DESIGN BUILD BY

ADMINISTRATION PROJECT OF A REST

HOUSE BUNGALOW LOCATED IN THE

MOUNTAINSIDE, 60 KM AWAY FROM

THE MUNICIPAL HALL. ARCHITECT

REYES PREPARED HIS TEAM AND

STARTED WORKING ON THE PROJECT

IMMEDIATELY.

Any dispute between the Client and the

Architect under the Design-Build Agreement

should be settled through:

a)

Barangay-Lupong Tagapayapa

b)

Arbitration

c)

Mediation

d)

Small Claims Court

77.

A CLIENT HIRES

ARCHITECT REYES IN DESIGN BUILD BY

ADMINISTRATION PROJECT OF A REST

HOUSE BUNGALOW LOCATED IN THE

MOUNTAINSIDE, 60 KM AWAY FROM

THE MUNICIPAL HALL. ARCHITECT

REYES PREPARED HIS TEAM AND

STARTED WORKING ON THE PROJECT

IMMEDIATELY.

For monetary claims and disputes less than

One Hundred Thousand Pesos, the process of

collection should be through:

a)

Barangay

b)

Arbitration

c)

Small Claims Court

d)

Fiscal Office

78.

A CLIENT HIRES

ARCHITECT REYES IN DESIGN BUILD BY

ADMINISTRATION PROJECT OF A REST

HOUSE BUNGALOW LOCATED IN THE

MOUNTAINSIDE, 60 KM AWAY FROM

THE MUNICIPAL HALL. ARCHITECT

REYES PREPARED HIS TEAM AND

STARTED WORKING ON THE PROJECT

IMMEDIATELY.

If in any case, a project under arbitration, how

many days should both parties complies with the

arbitration order?

a)

15 days

b)

21 days

c)

45 days

d)

30 days

79.

In selection of an arbitration committee to

settle questions of disputes, the members should

be composed of one representative each by both

parties and the other should be:

a)

A neutral member

b)

Clients relative

c)

Architect's representative

d)

Project manager

80.

As per the GU code the maximum a

professional can pay his Community Tax

Certificate (CEDULA) is how much

a)

P 5.000.00

b)

P 100.00

c)

P 20.00

d)

P 1,000.00

81.

Which among the choices should have the

highest weight in relation to the architect’s

responsibility to the people?

a)

Respect and conserve the environment

b)

Promote the interest of the his/her professional

organization

c)

Do not deceive the public

d)

All of the above

82.

In relation to the architect’s responsibility to

the client, which among the choices should the

architect not heed?

a)

Give the client an overview of the project

b)

To give assurance of the cost of the project

c)

Protect the client’s interest

d)

To keep the client informed at all times

83.

In preparation of the contract documents, the

architect should always consider and include in

the contract the following provisions except one:

a)

Negotiation

b)

Mediation

c)

Arbitration

d)

Out of court settlement

84.

APPRENTICE A AND B ARE

EMPLOYED UNDER Z ARCHITECTURAL

FIRM, HEADED BY ARCHITECT

SALVILLA. APPRENTICE A WAS

CAUGHT BY B GETTING THE SOFT

COPIES OF THE PROJECT THEY ARE

WORKING ON THROUGH A USB DRIVE?

A ARGUE THAT THERE IS NOTHING

ILLEGAL SINCE THEY ARE THE ONE

WORKING ON THE DOCUMENTS EVEN

WITHOUT THE CONSENT OF THEIR

BOSS.

Is the action of Apprentice A illegal?

a)

Yes

b)

No

c)

Tolerable

d)

Depends on the boss

85.

APPRENTICE A AND B ARE

EMPLOYED UNDER Z ARCHITECTURAL

FIRM, HEADED BY ARCHITECT

SALVILLA. APPRENTICE A WAS

CAUGHT BY B GETTING THE SOFT

COPIES OF THE PROJECT THEY ARE

WORKING ON THROUGH A USB DRIVE?

A ARGUE THAT THERE IS NOTHING

ILLEGAL SINCE THEY ARE THE ONE

WORKING ON THE DOCUMENTS EVEN

WITHOUT THE CONSENT OF THEIR

BOSS.

What should be the action of Apprentice B?

a)

Tolerate A

b)

Inform at once Architect Salvilla

c)

Ignore everything

d)

Resign

86.

APPRENTICE A AND B ARE

EMPLOYED UNDER Z ARCHITECTURAL

FIRM, HEADED BY ARCHITECT

SALVILLA. APPRENTICE A WAS

CAUGHT BY B GETTING THE SOFT

COPIES OF THE PROJECT THEY ARE

WORKING ON THROUGH A USB DRIVE?

A ARGUE THAT THERE IS NOTHING

ILLEGAL SINCE THEY ARE THE ONE

WORKING ON THE DOCUMENTS EVEN

WITHOUT THE CONSENT OF THEIR

BOSS.

If ever Arch. Salvilla will file a case in court

against Apprentice A, what should be the case?

a)

Petty Theft

b)

Robbery

c)

Violation of Cybercrime Law

d)

Qualified Theft

87.

The architect should always ask the

prospective suppliers for MSDS of the products

they are offering. What is MSDS?

a)

Material Specification and Drawing Sheet

b)

Material Swatches and Data Sets

c)

Material Safety Data Sheets

d)

Management System and Data Systems

88.

Which among the choices should the architect

not to consider in his/her relation to the

Manufacturer's Suppliers and Dealers?

a)

Not to accept gifts

b)

Accept free professional services and advises

c)

Decline monetary commissions

d)

Turn down at once personal favors

89.

The architect as the author and signatory of the

contract can be sued by the client in case of

breach and be held by a:

a)

Criminal case

b)

Civil Case

c)

Administrative case

d)

B and C

90.

Which among the following choices is not part

of Siteworks?

a)

Clearing, Grubbing and Clearing

b)

Micro tunneled piping

c)

Chain link fences

d)

Soil testing

91.

Under the General Requirements, which is not

part of the work?

a)

Building permit application

b)

Bond

c)

Insurance

d)

Staking

92.

Under what division of the master format

specification includes Concrete pipes?

a)

DIV 1

b)

DIV 2

c)

DIV 3

d)

DIV 4

93.

How many divisions were added to the 16

Division Standard Specifications after 2016?

a)

34

b)

35

c)

36

d)

37

94.

Means the cost of the cost of the completed

building to the Owner, including the structure,

MEFP, all elements attached to the plan and as

designed by the architect is called:

a)

Project Development Cost

b)

Project Construction Cost

c)

Total Building Cost

d)

Hard Cost

95.

This cost includes the cost of construction and

all professional fees and permits.

a)

Project Development Cost

b)

Project Construction Cost

c)

Total Building Cost

d)

Hard Cost

96.

In Project Development, all professional fees

and permit fees are classified as:

a)

Hard Cost

b)

Soft Cost

c)

Owner's Cost

d)

Add on Costs

97.

Who pays for the professional's insurances

during the project?

a)

Owner

b)

The Professional involve

c)

Architect

d)

Surety Company

98.

This scientific study allows the architect to

focus on the ways in which the building can best

maintain itself and prolong its life.

a)

Building appraisal

b)

Forensic Architecture

c)

Building certification

d)

NOTA

99.

Scope of service includes materials and

finishes, construction methodologies, building

envelopes, roofing systems, finest rations,

hardware, fixtures and fittings.

a)

Building Details Services

b)

Building Component Services

c)

Building Services

d)

Building Construction

100.

Knowledge in office operations, office

management, accounting, finance and taxation

are best described in:

a)

Architectural Management

b)

Management of Architectural Practice

c)

Architectural Practice

d)

Basic Management