Prof. Prac. Part 3

Total questions: 100

Worksheet time: 50mins

Name
Class
Date
1.

Recommends the systematic process of

ensuring a building’s array of systems is planned,

designed, installed and tested to perform

according to design intent and building’s

operational needs?

a)

Building Systems Testing

b)

Management Commissioning and Testing

c)

Building Commissioning

d)

Building Acceptance

2.

Republic Act 9285 is also known as

a)

Architects Dispute Act of 2004

b)

Alternative Dispute Resolution Act of 2004

c)

Mediation Act of 2016

d)

Arbitration Act of 2010

3.

What government agency implements the

provision of RA 9285?

a)

DOJ

b)

Court of Appeals

c)

CIAC

d)

CAMA

4.

What is the first phase of the Architects Basic

Services?

a)

Schematic Design Phase

b)

Project Definition Phase

c)

Meet Up Phase

d)

Site Visit Phase

5.

In the final submitted construction cost to the

owner, who prepares the Bill of Quantities (BOQ)?

a)

Architect

b)

Contractor

c)

Construction Manager

d)

Project Manager

6.

Who prepares the Bill of Materials (BOM)?

a)

Architect

b)

Contractor

c)

Construction Manager

d)

Project Manager

7.

The architect may prepare and come up with

the Project Construction Cost through the

following estimate technique except:

a)

Area Method

b)

Detailed estimate

c)

Volume method

d)

Interest rate method

8.

What is the suitable estimate technique

during the Project definition and Schematic

Design Phase of the Project?

a)

Area Method

b)

Detailed estimate

c)

Volume method

d)

Interest rate method

9.

In RA 9266, it refers to an actor behavior that

gravely violates the sentiment or accepted

standards of the community?

a)

Moral authority

b)

Moral behavior

c)

Moral turpitude

d)

NOTA

10.

In labor-materials ratio, what is the most

common ratio used in the Philippine setting in

coming out with an estimate?

a)

70-30%

b)

80-20%

c)

65-35%

d)

Depends on the contractor

11.

What unit is primarily used in estimating rebar

requirements?

a)

Unit weight

b)

Commercial Length

c)

Bar diameter

d)

Number of pieces

12.

Refers to contracts or arrangements involving

the transfer of systematic knowledge for the

manufacture of a product.

a)

Technology transfer

b)

Knowledge transfer

c)

Technical transfer

d)

Transfer of technology

13.

Which is not an Ancillary permit?

a)

Fencing permit

b)

Structural permit

c)

Sanitary permit

d)

Electrical permit

14.

In case the building owner is not the owner of

the lot he/she is building on, what must they

provide to the Building Official in application of

Building permit?

a)

Deed of sale

b)

Lot owners Consent

c)

Special Power of Attorney

d)

Acknowledgment Note

15.

The Architects plans, models and perspectives

are called ___.

a)

Contract Documents

b)

Project Documents

c)

Presentation kit

d)

Instrument of service

16.

A written statement from the architect

confirming the amount of money due to the

contractor once work is accomplished.

a)

Certificate of Completion

b)

Request for Payment

c)

Statement of Account

d)

Billing Statement

17.

An 8-hour site supervision falls under what

Architect's Services?

a)

Construction Management

b)

Project Management

c)

Full Time Supervision Services

d)

Design and Supervision Service

18.

In this selection process, the Architect explains

his methodology in translating the plan and

design requirements of the proposed project.

a)

Verification

b)

Pre-qualification

c)

Evaluation and Ranking

d)

Interview

19.

Which is not a required knowledge for a

Consulting Architect in the practice of

Architectural Research Methods?

a)

Architectural writing and Photography

b)

Philippine Architecture and History

c)

Architectural Design trends

d)

Specifications writing

20.

Cost based method employed for Non-

Creative works

a)

Unit cost method

b)

Multiple of Direct Personnel Expense

c)

Lump sum or fixed fee

d)

PF plus expenses

21.

Which among the following is not an ASEAN

country?

a)

Philippines

b)

Singapore

c)

Thailand

d)

Nepal

22.

APEC architects can practice architecture

within the APEC member countries except one

a)

Canada

b)

New Zealand

c)

Peru

d)

Bolivia

23.

Who was the first ASEAN and APEC Filipino

Architect?

a)

Prosperidad Luis

b)

Yolanda Reyes

c)

Armando Alli

d)

Robert Sac

24.

When was the first conferment of title APEC

architects made?

a)

2000

b)

2006

c)

2010

d)

2017

25.

Any physical change made on a building or

structure to increase its value, utility, and or

improve its aesthetic quality

a)

Alteration

b)

Addition

c)

Renovation

d)

Repair

26.

What is the general basis of the Architects

minimum basic fee?

a)

Project Construction Cost

b)

Type of Structure

c)

Architect's community standing

d)

Owner's choice

27.

Which of the following is not within the scope

of practice of architecture?

a)

Public administration

b)

Building maintenance and administration

c)

Site Analysis

d)

Feasibility studies, financing, and promotional

studies

28.

The selection of the member of the Board of

Architecture will start with the submission of a list

of five nominees submitted by whom?

a)

DPWH

b)

PRC

c)

IAPOA

d)

CODHASP

29.

Who shall accredit the Continuing Professional

Development providers?

a)

IAPOA

b)

PRBOA

c)

CHED

d)

CODHASP

30.

Under the CPD Law, Architects who wish to

renew their licenses must acquire how many CPD

units every three years cycle?

a)

36 units

b)

45 units

c)

24 units

d)

60 units

31.

Which of the following is included under Part 1

of a three-part section specification format?

a)

General Requirements

b)

Mixes

c)

Fabrication

d)

Installation

32.

Who among the choices cannot issue a

construction?

a)

Prudential Guarantee

b)

UCPB Generali

c)

MAPRE

d)

Salvador Bail Bond

33.

Type of Specification that identifies the

manufacturers name and brand name

a)

Closed

b)

Performance

c)

Descriptive

d)

Reference

34.

Which should be avoided in Specifications

writing?

a)

Long and ambiguous sentences

b)

Simple declarative sentences

c)

Plain worded Specs

d)

Essay type specs

35.

Three dimensional and computer graphics

Technology offers both Architects and Client the

advantage of:

a)

Work efficiency and realistic visualization

b)

High end presentation

c)

High payment for the architect

d)

Clients bragging rights

36.

Under the New TRAIN Law, how much is the

Architects Value Added Tax?

a)

10.5%

b)

12%

c)

10%

d)

8%

37.

What is the size of Basic drawing submitted to

the OBO in applications of Building Permit?

a)

A1 size

b)

A0 size

c)

A3 size

d)

A4 size

38.

The Architect has chosen a winning bidder but

the Owner doesn't approve, what is the architect's

course of action?

a)

Negotiate

b)

Re-bid

c)

Toss coin

d)

No action needed

39.

For registration of architectural corporation,

where would you go first?

a)

SEC

b)

DTI

c)

City Hall

d)

PRC

40.

RA 9266, known as "An act to regulate the

practice of Architecture in the Philippines" was

signed and sealed on?

a)

April 10, 2004

b)

March 17, 2004

c)

January 28, 2004

d)

January 29, 2004

41.

How much will an Architect pays if he violates

Code of Ethical Conduct?

a)

100,000 - 5,000,000

b)

1,000,000 - 4,000,000

c)

5,000,000 - 7.000.000

d)

200,000 - 3,000,000

42.

What must be the character of Architect

nowadays?

a)

Flexible in design

b)

Focus on all undertakings

c)

Modern strict

d)

Relax

43.

What should a newly passed in Architecture

Licensure Examination do after?

a)

Prepare for Oathtaking

b)

Wait for result

c)

Prepare for projects

d)

Must celebrate

44.

Replacement of loss PRC I.D. upon submission

of requirements?

a)

Immediate (1 day)

b)

1 week

c)

2 weeks

d)

1 month

45.

Which of the following is architect's

responsibilities in relation to the public?

a)

Shall respect and help conserve the system of

values and natural, historic and cultural heritage of

the community and improve the environment

b)

Shall respect colleague and subordinates

c)

Shall adhere good conduct in relation to

environments and traffic rules

d)

All of the choices

46.

How to determine the width of sidewalk?

a)

Volume of pedestrian

b)

Width of planting strip

c)

Size of the place

d)

Size of road right of way

47.

Situational about provision of temporary

sidewalk

a)

Provide temporary sidewalk

b)

Provide gutter

c)

Provide drainage

d)

Provide curb cut out

48.

Architect-in-charge of Construction is

responsible to owner on what matter?

a)

Administrative matter

b)

Technical matter- to Architect

c)

Design matter

d)

Construction matter

49.

This is not a reason for refusal of registration

and removal of name from roster of Architects or

revocation of license.

a)

Immoral and dishonorable conduct

b)

Convicted on criminal offense

c)

Conviction of political offense

d)

Moral Turpitude

50.

For contract documents, who is the author of

the drawings under the Intellectual property rights

law?

a)

Architect-of-Record

b)

Owner

c)

Client

d)

Engineer

51.

Standard size of Architectural drawings?

a)

15x30

b)

20x30

c)

A3

d)

A4

52.

The "Architecture Act of 2004"

a)

RA 9266

b)

RA 9662

c)

RA 545

d)

PD 49

53.

Section 41 of RA 9266

a)

Implementing Rules and Regulation of Code of

Ethical Conduct and Standard of Professional

Practice

b)

Malpractice

c)

Foreign architect

d)

None of the choices

54.

The Architect determines the adequate size

and appropriate configuration and assemblage for

a proposed project in consideration of the use,

allocation and interface of spaces for given

activities?

a)

Architectural Programming

b)

Space Planning

c)

Space Management

d)

Space Allocation

55.

Drawing usually done in early stage of design?

a)

Preliminary Sketches

b)

Conceptual Design

c)

Design Development

d)

Bidding

56.

As an Architect, what must be done in early

stage of engagement with the client?

a)

Explain well the scope of work of an Architect

b)

Prepare the contract

c)

Ask for down payment

d)

Ask for project information

57.

Who can file the violation of Code of Ethical

Conduct?

a)

Anyone

b)

Another Architect who is aware on violation

c)

PRC

d)

IAPOA

58.

Who prepare the Bill of Materials?

a)

Architect

b)

Owner

c)

Contractor

d)

Construction Manager

59.

It is a scale or full-size model of a design or

device, used for teaching, demonstration, design

evaluation, promotion, and other purposes.

a)

Approval sample

b)

Prototype

c)

Mock-up

d)

Specimen

60.

For the client, what would not be the basis for

the Architect's Professional Fee?

a)

Talent and skills

b)

Design knowledge

c)

Personal Relation

d)

Contract Documents

61.

Foreign Architect can practice in Philippines

provided that it must have.

a)

Local Counterpart

b)

Visa

c)

Project

d)

License from his country

62.

Building Appraisal Function.

a)

Estimates the value on the building

b)

Decide if building is sound

c)

Ascertain if building is properly design

d)

Estimates the construction of building

63.

Provided standards and technical requirement

for economic and socialized housing projects in

rural and urban areas.

a)

PD 957

b)

BP 220

c)

PD 9514

d)

PD 1216

64.

The Architect of Record is on the building that

he design?

a)

Liable

b)

Charged

c)

Penalized

d)

Fined

65.

Which of the following is not sign and seal by

the Architect?

a)

Architectural Plan

b)

Specifications

c)

Bill of Materials

d)

Roof Plan

66.

Under NBC, it is a dwelling containing 2 or

more separate living units each of which is

separated from another by party or lot lines walls

and provided with independent access.

a)

Single detached

b)

Single attached

c)

Row house

d)

Apartment

67.

Compensation for Post Construction Services

a)

Percentage of gross rental

b)

Monthly

c)

Per hour

d)

Per week

68.

Grab bar height at water closet at PWD toilet?

a)

0.80m

b)

0.90m

c)

1.00m

d)

1.10m

69.

Window width for fire exit?

a)

700mm

b)

750mm

c)

800mm

d)

850mm

70.

Fire Exit Door should open?

a)

At all times

b)

During Emergency

c)

At office hours

d)

All of the choices

71.

Under NBC what is the minimum dimension of

a habitable room?

a)

2.00m

b)

1.75m

c)

3.00m

d)

2.50m

72.

Under NBC what is the minimum dimension

of a kitchen?

a)

1.50m

b)

1.75m

c)

3.00 m

d)

2.50m

73.

Under NBC what is the minimum dimension of

a toilet?

a)

0.90m

b)

1.75m

c)

3.00m

d)

2.50m

74.

Under NBC what is the ceiling at the first floor

with natural ventilation?

a)

2.70m

b)

3.75m

c)

3.00m

d)

2.50m

75.

Under NBC what is the ceiling at the first floor

with artificial ventilation?

a)

2.70m

b)

3.75m

c)

3.00m

d)

2.50m

76.

Under NBC what is the ceiling at the second

floor with artificial ventilation? (2.4 actual answer)

a)

2.70m

b)

3.75m

c)

3.00m

d)

2.50m

77.

A rule thumb used for estimate of materials on

residential project

a)

65% of project construction

b)

70% of project construction

c)

55% of project construction

d)

80% of project construction

78.

As an Architect, how do you compensate your

subordinates?

a)

Provide good workplace/environment

b)

Provide salary commensurate to work

c)

Provide minimum wage

d)

Per hour with free lunch

79.

Under BP 344, how much is the space

allocated of wheel chair turning radius?

a)

2.00m

b)

1.50m

c)

3.00m

d)

1.20m

80.

_________ are all on-site work done from site

preparation, excavation, foundation, assembly of

all the components and installation of utilities and

equipment of buildings/structure.

a)

Demolition

b)

Construction

c)

Renovation

d)

Installation

81.

Under NBC, what is the minimum width of

stairway?

a)

0.75m

b)

1.00m

c)

3.00m

d)

0.85m

82.

A well-managed office is like a car that.

a)

is running smoothly

b)

has plenty of gas and oil

c)

running is good speed

d)

is in good condition

83.

As a veteran architect with your own

architectural practice, why do you need a

secretary?

a)

To prepare contract documents and keep track

of various on-going projects

b)

To secure client meetings

c)

To keep office record in order

d)

To prepare documents

84.

Any person, entity, public or private, Filipino or

foreigner, who shall force an architect to perform

any service under the general practice of

architecture, without executing a written contract

agreement is guilty of misdemeanor and is

sentenced to a fine of not less than

a)

P 100,000.00

b)

P 200,000.00

c)

P 1,000,000.00

d)

P 2,000,000.00

85.

You recently passed the board, and you've

gotten your licensed as an architect, which of the

following is unethical for you to do?

a)

Steal fellow architect's intellectual properties

b)

Take a project from fellow architect who was

already commissioned to do the work

c)

Punch the boastful architect

d)

All of the above

86.

JESSE PASS THE

ARCHITECTURE LICENSURE

EXAMINATION WITH FLYING COLORS

AND COME BACK TO HIS OLD JOB IN

SINGAPORE. HIS BOSS WAS SO

IMPRESSED, THAT HE WANTED TO SETUP

AN ARCHITECTURAL FIRM IN THE

PHILIPPINES.

What should Jesse’s boss do to practice

architecture in the Philippines?

a)

He should should collaborate with a Filipino

Firm/Architect and be partners, to be able to

practice architecture in the Philippines

b)

He should register his firm and begin practicing

architecture in the Philippines

c)

He is not allowed to put up an architectural firm

in the Philippines

d)

He could practice architecture in the Philippines

anytime he wants

87.

JESSE PASS THE

ARCHITECTURE LICENSURE

EXAMINATION WITH FLYING COLORS

AND COME BACK TO HIS OLD JOB IN

SINGAPORE. HIS BOSS WAS SO

IMPRESSED, THAT HE WANTED TO SETUP

AN ARCHITECTURAL FIRM IN THE

PHILIPPINES.

If Jesse's boss could put up an architectural

firm in the Philippines, what should be his first

move to register his business?

a)

Register his company at DTI

b)

Register his company at SEC

c)

Get a license to practice architecture in the

Philippines as a Foreign partner at PRC

d)

Get a License to practice architecture in the

Philippines as a Foreign partner at UAP

88.

JESSE PASS THE

ARCHITECTURE LICENSURE

EXAMINATION WITH FLYING COLORS

AND COME BACK TO HIS OLD JOB IN

SINGAPORE. HIS BOSS WAS SO

IMPRESSED, THAT HE WANTED TO SETUP

AN ARCHITECTURAL FIRM IN THE

PHILIPPINES.

If Jesse and his boss were to be partners in a

firm in the Philippines, where should their

company be registered?

a)

DTI only

b)

SEC only

c)

DTI, SEC and PRC only

d)

DTI and SEC only

89.

If you purchased 1 million worth of furniture

and equipment for your office that you just set-up,

how much did you pay for the VAT?

a)

300,000.00

b)

107,142.86

c)

120,000.00

d)

107,857.14

90.

A client wants you to his Architect but you

found out that there is another Architect involved.

What would you do?

a)

Get it that's an opportunity

b)

Ask the client how much is the design fee of the

other architect and lower your design fee

c)

Refuse

d)

Call the other architect and ask courtesy

91.

As per Supplemental IRR of RA 9266,

Standards of Professional Practice, what is the

basis of the preparation of Contract Documents

wherein the Architect prepares the detailed

designs, Construction Drawings and Technical

Specifications in seven (7) sets?

a)

Approved Schematic and Conceptual Plans

b)

Architectural program

c)

Approved Design Development Documents

d)

Contract Documents

92.

AN ARCHITECT

ADMINISTERED APPRENTICE A & B TO

BE WORKING FOR A 3-STOREY

RESIDENCE, APPRENTICE A BEING THE

SITE SUPERVISOR AND APPRENTICE B

IN-CHARGE OF DOING THE

PRODUCTION OF WORKING

DRAWINGS, AS THE PROJECT FOR A

DESIGN-BUILD PROJECT. THE

ARCHITECT WAS SO BUSY WITH HIS

OTHER PROJECTS AND THAT HE

TRUSTED EVERYTHING TO BOTH

APPRENTICE A & B. UPON THE

PROGRESS OF THE PROJECT, WORK

WENT WELL UNTIL THE ARCHITECT

FOUND OUT THAT THERE WAS PART OF

THE HOUSE THAT WAS NOT FOLLOWED

AS PER PLAN BECAUSE OF SOME

DISCREPANCIES THAT WERE PRESENT

IN THE CONSTRUCTION DRAWINGS.

Whose fault is it?

a)

Apprentice A for not informing that there were

discrepancies in the drawings.

b)

Apprentice B for producing drawings with

discrepancies.

c)

The architect for not giving time to check the

works of his apprentice.

d)

The client, for not inspecting the project.

93.

AN ARCHITECT

ADMINISTERED APPRENTICE A & B TO

BE WORKING FOR A 3-STOREY

RESIDENCE, APPRENTICE A BEING THE

SITE SUPERVISOR AND APPRENTICE B

IN-CHARGE OF DOING THE

PRODUCTION OF WORKING

DRAWINGS, AS THE PROJECT FOR A

DESIGN-BUILD PROJECT. THE

ARCHITECT WAS SO BUSY WITH HIS

OTHER PROJECTS AND THAT HE

TRUSTED EVERYTHING TO BOTH

APPRENTICE A & B. UPON THE

PROGRESS OF THE PROJECT, WORK

WENT WELL UNTIL THE ARCHITECT

FOUND OUT THAT THERE WAS PART OF

THE HOUSE THAT WAS NOT FOLLOWED

AS PER PLAN BECAUSE OF SOME

DISCREPANCIES THAT WERE PRESENT

IN THE CONSTRUCTION DRAWINGS.

What would be the architect's action on the

initial stage of this scenario?

a)

The architect should have looked over the works

of his apprentices before implementing any action

in the site.

b)

The architect should have placed more

apprentices to look over the project.

c)

The architect should have left the other project

and concentrate on this one.

d)

The apprentices should have told the architect

ahead of time that they can't handle the scope of

work given to them.

94.

AN ARCHITECT

ADMINISTERED APPRENTICE A & B TO

BE WORKING FOR A 3-STOREY

RESIDENCE, APPRENTICE A BEING THE

SITE SUPERVISOR AND APPRENTICE B

IN-CHARGE OF DOING THE

PRODUCTION OF WORKING

DRAWINGS, AS THE PROJECT FOR A

DESIGN-BUILD PROJECT. THE

ARCHITECT WAS SO BUSY WITH HIS

OTHER PROJECTS AND THAT HE

TRUSTED EVERYTHING TO BOTH

APPRENTICE A & B. UPON THE

PROGRESS OF THE PROJECT, WORK

WENT WELL UNTIL THE ARCHITECT

FOUND OUT THAT THERE WAS PART OF

THE HOUSE THAT WAS NOT FOLLOWED

AS PER PLAN BECAUSE OF SOME

DISCREPANCIES THAT WERE PRESENT

IN THE CONSTRUCTION DRAWINGS.

To whom are apprentices A & B civilly liable?

a)

To the architect

b)

To the client

c)

To the contractor

d)

Not among the choices

95.

AN ARCHITECT

ADMINISTERED APPRENTICE A & B TO

BE WORKING FOR A 3-STOREY

RESIDENCE, APPRENTICE A BEING THE

SITE SUPERVISOR AND APPRENTICE B

IN-CHARGE OF DOING THE

PRODUCTION OF WORKING

DRAWINGS, AS THE PROJECT FOR A

DESIGN-BUILD PROJECT. THE

ARCHITECT WAS SO BUSY WITH HIS

OTHER PROJECTS AND THAT HE

TRUSTED EVERYTHING TO BOTH

APPRENTICE A & B. UPON THE

PROGRESS OF THE PROJECT, WORK

WENT WELL UNTIL THE ARCHITECT

FOUND OUT THAT THERE WAS PART OF

THE HOUSE THAT WAS NOT FOLLOWED

AS PER PLAN BECAUSE OF SOME

DISCREPANCIES THAT WERE PRESENT

IN THE CONSTRUCTION DRAWINGS.

In this project, who is responsible for obtaining

a Certificate of Occupancy upon completion of the

project?

a)

Architect

b)

Engineer

c)

Book keeper

d)

Owner

96.

AN ARCHITECT

ADMINISTERED APPRENTICE A & B TO

BE WORKING FOR A 3-STOREY

RESIDENCE, APPRENTICE A BEING THE

SITE SUPERVISOR AND APPRENTICE B

IN-CHARGE OF DOING THE

PRODUCTION OF WORKING

DRAWINGS, AS THE PROJECT FOR A

DESIGN-BUILD PROJECT. THE

ARCHITECT WAS SO BUSY WITH HIS

OTHER PROJECTS AND THAT HE

TRUSTED EVERYTHING TO BOTH

APPRENTICE A & B. UPON THE

PROGRESS OF THE PROJECT, WORK

WENT WELL UNTIL THE ARCHITECT

FOUND OUT THAT THERE WAS PART OF

THE HOUSE THAT WAS NOT FOLLOWED

AS PER PLAN BECAUSE OF SOME

DISCREPANCIES THAT WERE PRESENT

IN THE CONSTRUCTION DRAWINGS.

On this project, how many percent should the

architect charge?

a)

10% of PCC

b)

10% plus the charge for design-build services

c)

10% plus the contract amount

d)

10% plus the supervision fee and contract

amount

97.

AN ARCHITECT

ADMINISTERED APPRENTICE A & B TO

BE WORKING FOR A 3-STOREY

RESIDENCE, APPRENTICE A BEING THE

SITE SUPERVISOR AND APPRENTICE B

IN-CHARGE OF DOING THE

PRODUCTION OF WORKING

DRAWINGS, AS THE PROJECT FOR A

DESIGN-BUILD PROJECT. THE

ARCHITECT WAS SO BUSY WITH HIS

OTHER PROJECTS AND THAT HE

TRUSTED EVERYTHING TO BOTH

APPRENTICE A & B. UPON THE

PROGRESS OF THE PROJECT, WORK

WENT WELL UNTIL THE ARCHITECT

FOUND OUT THAT THERE WAS PART OF

THE HOUSE THAT WAS NOT FOLLOWED

AS PER PLAN BECAUSE OF SOME

DISCREPANCIES THAT WERE PRESENT

IN THE CONSTRUCTION DRAWINGS.

A family of architects and engineers plans to

set-up and architectural company to cater

architectural services. What percentage of share

should the architect have?

a)

75%

b)

85%

c)

70%

d)

90%

98.

AN ARCHITECT DREW UP

PLANS FOR A FAMILY. THE OWNERS

WENT ABROAD AFTER A YEAR, THE

OWNER RETURNED BUT INSTRUCTED

THE ARCHITECT TO HELP THEM FIND A

NEW LOT, THE TASK WOULD ENTAIL

THE ARCHITECT'S PERSONAL TIME.

What stage in the Architect's services will the

Architect perform?

a)

Pre-design Services

b)

Regular Design Services

c)

Comprehensive Archt'l Services

d)

Specialized Allied Services

99.

AN ARCHITECT DREW UP

PLANS FOR A FAMILY. THE OWNERS

WENT ABROAD AFTER A YEAR, THE

OWNER RETURNED BUT INSTRUCTED

THE ARCHITECT TO HELP THEM FIND A

NEW LOT, THE TASK WOULD ENTAIL

THE ARCHITECT'S PERSONAL TIME.

What will be the ideal method of

compensation that the Architect should use if he

is to find a new site for the project?

a)

Percentage of Construction Cost

b)

Per diem plus reimbursable expenses

c)

MDPE

d)

Lump sum inclusive of arch fee

100.

AN ARCHITECT DREW UP

PLANS FOR A FAMILY. THE OWNERS

WENT ABROAD AFTER A YEAR, THE

OWNER RETURNED BUT INSTRUCTED

THE ARCHITECT TO HELP THEM FIND A

NEW LOT, THE TASK WOULD ENTAIL

THE ARCHITECT'S PERSONAL TIME.

What can the Architect suggest to the owners

to minimize spending?

a)

Buy a New House

b)

Buy a New Lot

c)

Buy Existing House & Lot then renovate

d)

Buy Existing House