Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

PDD Unit 5 DFM and Prototyping

Total questions: 46

Worksheet time: 23mins

Name
Class
Date
1.

What is a key determinant of the economic success of a product?

a)

Cost

b)

Component complexity

c)

Manufacturing location

d)

Product quality

2.

What is the difference between the manufacturer's selling price and the cost of making the product called?

a)

Economic success

b)

Assembly cost

c)

Production cost

d)

Profit margin

3.

What is Design for Manufacturing (DFM) aimed at achieving?

a)

High product quality with high cost

b)

Low cost without sacrificing product quality

c)

Complex product design

d)

Global production

4.

Which type of team is required for effective Design for Manufacturing (DFM)?

a)

Manufacturing team

b)

Single-discipline team

c)

Cross-functional team

d)

External consultants

5.

How many steps are involved in the DFM method?

a)

Five steps

b)

Seven steps

c)

Three steps

d)

Ten steps

6.

What is the first step in the DFM method?

a)

Estimate the manufacturing costs

b)

Reduce the costs of components

c)

Reduce the costs of assembly

d)

Consider the strategic sourcing decisions

7.

What is the make-versus-buy decision in sourcing a product?

a)

Decision to make or buy the product

b)

Decision to sell the product

c)

Decision to outsource production

d)

Decision to redesign the product

8.

What is the most fundamental decision made in sourcing a product?

a)

Supplier arrangements

b)

Make-versus-buy decision

c)

Vertical integration level

d)

Location of production

9.

What is the term for the decision of what to outsource in sourcing a product?

a)

Supplier selection

b)

Outsourcing decision

c)

Make-buy decision

d)

Production decision

10.

What is the main factor that drives location decisions in production?

a)

Capabilities and ecosystem

b)

Duties

c)

Transport costs

d)

Factor prices

11.

Which type of supplier arrangement involves all production activities being outsourced to different suppliers?

a)

Full vertical integration

b)

Final assembly only

c)

Orchestration of suppliers

d)

Contract manufacturing

12.

What is the term for a supplier coordinating all aspects of component production and assembly, as well as completing detailed design of the product?

a)

Engaging an original design and manufacturer (ODM)

b)

Orchestration of suppliers

c)

Final assembly only

d)

Full vertical integration

13.

Which region is known for its dense ecosystem for consumer electronics production?

a)

Bangladesh

b)

India

c)

Vietnam

d)

Greater Shenzhen region in southern China

14.

What are duties imposed on some imports called?

a)

Tariffs

b)

Subsidies

c)

Taxes

d)

Fees

15.

What is the most efficient means of transport for goods produced distant from the markets in which they are sold?

a)

Truck

b)

Rail

c)

Ocean freight in shipping containers

d)

Airplane

16.

What is the metric of cost for a product that firms generally use?

a)

Variable costs

b)

Unit cost

c)

Total costs

d)

Fixed costs

17.

What are the three categories into which costs within the factory can be divided?

a)

Supplier costs, Transportation costs, Duties

b)

Component costs, Assembly costs, Overhead costs

c)

Support costs, Indirect allocations, Logistics costs

d)

Variable costs, Fixed costs, Logistics costs

18.

What is the term used to describe the costs associated with materials handling, quality assurance, and facilities?

a)

Variable costs

b)

Support costs

c)

Overhead costs

d)

Supplier profit

19.

What is the phenomenon labeled when the manufacturing cost of a product drops as the production volume increases?

a)

Logistics costs

b)

Variable costs

c)

Fixed costs

d)

Economies of scale

20.

What is the strategy where the team provides a supplier with only a black box description of the component?

a)

Functional specification

b)

Black box supplier design

c)

Standard components

d)

Custom components

21.

What is the subset of DFM that involves minimizing the cost of assembly?

a)

Design for manufacturing

b)

Design for logistics

c)

Design for production

d)

Design for assembly

22.

What is the term used to describe the strategy of combining separate adjacent parts into a single part?

a)

Integrate Parts

b)

Maximize Ease of Assembly

c)

Standardize Components

d)

Error Proofing

23.

What is the important aspect of DFM that involves anticipating possible failure modes of the production system?

a)

Consider Customer Assembly

b)

Reduce the Costs of Supporting Production

c)

Error Proofing

d)

Minimize Systemic Complexity

24.

What are logistics costs composed of?

a)

Manufacturing costs

b)

Freight costs and duties

c)

Duties only

d)

Freight costs only

25.

What is the term used to describe the strategy of minimizing volume in logistics?

a)

Partial disassembly, folding, or compression

b)

Delayed final packaging

c)

Minimum carton size

d)

Limited or no packaging

26.

What is the term used to describe the process of designing products that are easy to manufacture?

a)

Design for Manufacturing (DFM)

b)

Design for Logistics (DFL)

c)

Design for Assembly (DFA)

d)

Design for Production (DFP)

27.

What is the strategy that focuses on reducing the number of parts in a product to simplify manufacturing?

a)

Standardize Components

b)

Minimize Systemic Complexity

c)

Integrate Parts

d)

Maximize Ease of Assembly

28.

What is the term used to describe the practice of designing products with minimal packaging to reduce logistics costs?

a)

Partial disassembly, folding, or compression

b)

Delayed final packaging

c)

Minimum carton size

d)

Limited or no packaging

29.

What are the different types of prototypes based on the degree of physicality?

a)

Analytical and Theoretical

b)

Physical and Virtual

c)

Physical and Analytical

d)

Tangible and Intangible

30.

Why are physical prototypes important in product development?

a)

To simplify the design

b)

To detect unanticipated phenomena

c)

To speed up the process

d)

To save costs

31.

What is the purpose of creating a prototype in a product development project?

a)

To delay the project

b)

To reduce risk

c)

To increase complexity

d)

To complicate the design

32.

What is the benefit of using an analytical prototype before a physical prototype?

a)

It is easier to manufacture

b)

It is more visually appealing

c)

It allows for larger design changes

d)

It is cheaper to build

33.

What is the main goal of economic analysis in product development?

a)

To increase production costs

b)

To reduce quality

c)

To complicate decision-making

d)

To generate profit

34.

What is the purpose of sensitivity analysis in economic analysis?

a)

To understand project trade-offs

b)

To complicate the model

c)

To ignore key assumptions

d)

To reduce profitability

35.

What is the role of project management in product development?

a)

To increase project costs

b)

To complicate resource allocation

c)

To delay project completion

d)

To plan and coordinate resources

36.

Why is project execution important in product development?

a)

To coordinate resources

b)

To avoid unanticipated events

c)

To simplify tasks

d)

To complicate the process

37.

What is the purpose of outlining an experimental plan for a prototype?

a)

To increase complexity

b)

To complicate the analysis

c)

To reduce the number of variables

d)

To delay testing

38.

Why are comprehensive prototypes important in product development?

a)

To slow down production

b)

To increase costs

c)

To identify design flaws

d)

To confuse customers

39.

What is the main goal of prototyping in product development?

a)

To increase system complexity

b)

To minimize costs

c)

To avoid testing

d)

To delay the project

40.

How can prototypes help in reducing the risk of costly iterations?

a)

By complicating the design

b)

By increasing the number of iterations

c)

By speeding up the process

d)

By providing valuable learning

41.

What is the purpose of creating a schedule for procurement, construction, and testing of a prototype?

a)

To delay the project

b)

To coordinate activities

c)

To increase costs

d)

To avoid testing

42.

Why is qualitative analysis important in economic analysis?

a)

To capture measurable factors

b)

To consider non-quantifiable factors

c)

To simplify decision-making

d)

To quantify all implications

43.

What is the main goal of successful product development projects?

a)

To achieve high-quality, low-cost products

b)

To complicate resource allocation

c)

To reduce quality

d)

To increase costs

44.

How can project execution help in minimizing risks in product development?

a)

By increasing the number of unanticipated events

b)

By complicating resource allocation

c)

By simplifying tasks

d)

By delaying the project

45.

What is the primary purpose of economic analysis in product development?

a)

To increase production costs

b)

To reduce quality

c)

To complicate decision-making

d)

To generate profit

46.

Why is sensitivity analysis crucial in economic analysis for product development?

a)

To complicate the model

b)

To ignore key assumptions

c)

To reduce profitability

d)

To understand project trade-offs