Which of the following types of construction will provide the best heat insulation?
1 brick thick solid wall
Traditional cavity wall
Timber frame
Solid stone walling
What should be checked on a drawing to see if it is the correct version?
The Scale
The site address
The name of the client
The revision number
On a traditional domestic pitched roof construction, where is heat insulation usually provided?
Under the ceiling
Over the ceiling
Under the roof felt
Over the roof felt
On a structural beam under load, where will compression and tension take place?
Compression on top, tension underneath
Tension on top, compression underneath
Both compression and tension on top
Beam will be unaffected by either under load
Which of the following hatching represents stonework?
Cross hatching on a construction drawing component indicates a:
dark area
special area
section through
cutting line
Which of the following documents supports the working drawings
Manufacturer's technical information
The site drawings
The specification
bill of quantities
Profiles are used on site for:
setting out foundations
shaping components
outline drawings
surveyor's calculations
The sub-soil type least likely to be affected by drying out in warm weather is:
silty
clay
sandy
gravel
Which type of foundation covers the footprint of a building?
strip
raft
pier/pad
pile
Which of the following is not a benefit of using timber frame construction for outer walling?
Quicker site build
Increased energy efficiency
High levels of thermal insulation
Load bearing
Which contract document would be used to find the type of door that is required for a new building?
Tender
Quote
Schedule
Estimate
Plasterboard is fixed to metal stud partitions using:
rivets
self-tapping screws
plasterboard nails
tacks
Which of the following processes is not suitable for on-site application of protective coatings?
Airless spraying
Pressure impregnation
Synthetic brush
Pressure roller
What is a tender?
A company bid describing their offer price for the contract
An estimated cost of how much the contract will cost
An estimate of how long the job will take
A quote for a contract
Which of the following would not be used for thermal insulation in a structure?
polyethylene
polystyrene
polyurethane
glass fibre
Class A engineering bricks are used to:
form a barrier against moisture movement
support machinery in factories
add weight to foundations
provide aesthetic qualities
If an inaccurate estimate is given to a client, which of the following would be a likely outcome for the company concerned?
It would win the contract
It would lose money
It will charge extra on the final bill to compensate
It will not win the contract
The advantage of using plasterboard as an internal wall finish is it:
is strong and durable
minimises the use of wet trades
is easy to manoeuvre
is flexible to use
Concentrated alkali attack on non-ferrous metals may cause them to:
discolour
dissolve
disintegrate
oxidize
The walls of an entrance hallway subjected to high pedestrian traffic are best coated with a product that can be repeatedly washed/cleaned without damage. The paint type best suited for this is:
water based matt emulsion
solvent borne matt varnish
solvent borne gloss
water based texture coating
Which of the following would be a likely outcome of poor communication?
An operative gets the job completed on the time
Work is carried out efficiently
Everybody knows what is to be done
It could lead to costly mistakes
What is the advantage of an e-mail than a telephone message?
It gets to the person who requires it quicker
There is a written copy for future reference
It is electronic and therefore cheaper
Everyone has access to email
Solvent-borne paints should not be used on large internal areas because they:
are not designed for large areas
are toxic and flammable
are expensive to buy
are difficult to apply
Which of the following is MOST likely to happen if an apprentice is continuously shouted at?
Their work rate will improve
They will be happy in their work
They may become demoralised and less productive
They will apply for promotion
Which of the following would not be affected if stock rotation was not done?
Solvent-borne paints
Cement
Preservative coatings
Plaster
Using wet timber in new construction could cause:
excessive shrinkage and structural faults
rot and decay
discolouration and loss of appearance
reduction in structural strength
The deposit left on the surface of bricks when drying out is called:
staining
spalling
efflorescence
face deterioration
16) Which of the following scales would NOT be used within construction drawings?
1:5
1:10
1:300
1:500
Which of the following documents is used to set out a building?
Manufacturer's information
Drawings
Specifications
Schedules
What type of paint finish is most suitable for a high moisture area like a bathroom?
Oil-based gloss
Latex-based flat
Acrylic eggshell
Chalk
What is the primary purpose of damp-proof course (DPC) in building construction?
To insulate the building
To prevent water ingress into interior spaces
To enhance the aesthetic appeal of the building
To support structural loads
Which material is typically used for fireproofing steel structures in construction?
Polystyrene
Gypsum board
Mineral wool
Reinforced concrete
What is the primary function of a vapor barrier in building construction?
To enhance indoor air quality
To prevent moisture from passing into the insulation
To increase the structural integrity of the building
To provide sound insulation
What is the main advantage of using double-glazing windows in a building?
To reduce the cost of construction
To improve fire resistance
To enhance thermal insulation
To increase natural light