WorksheetsRIPA FA Quiz - MAY 2024
Total questions: 10
Worksheet time: 5mins
What is the name of the phase prior to system changeover (i.e. operating the old and new system concurrently)?
Parallel
Testing
Transition
As at 23-May-2024, how many migration waves have gone LIVE on CACEIS platform (GP & OLIS)?
5
4
2
As at 23-May-2024, funds from which region has gone live on CACEIS platform (GP & OLIS)?
Belgium & Luxembourg
Luxembourg & Switzerland
Belgium & Dublin
In total how many migration waves planned for RIPA FA?
8
15
10
What is shadow NAV training for?
To learn how to import trades in Multifonds
To learn the manual way of trade booking by mirroring all the transactions processed in Multifonds
To learn how to simulate funds in GP
Below are the issues encountered during parallel or GO-Live for Wave 3 & 4 except for?
All trades flowed / integrated automatically without any problem
Trade flow setup issues - trades missing / not interfaced.
Incomplete setup of system accesses
By end of which month, the FA RIPA training would be 100% completed?
End of May
End of June
End of July
What is the % of our workforce that should be trained by end of June 2024 as per goal set?
75%
60%
50%
What is Project Aurora about?
Migration of Singapore Operation to Malaysia
Migration of Hong Kong Operation to Malaysia
Migration of UK Operation to Malaysia
As part of the transition / migration, are all production staffs required to undergo RIPA FA training?
Yes
No