1.

Who is at the top of the site management team?

a)

Architect

b)

Client

c)

Building contractor

d)

Clerk of works

2.

Which role is responsible for ensuring health and safety on the site?

a)

Local Authority

b)

Building Control Officer

c)

Health and Safety Inspector

d)

Structural Engineer

3.

Who works directly under the Architect in the site management team?

a)

Client

b)

Clerk of works

c)

Building contractor

d)

Quantity surveyor

4.

Which of the following is NOT a part of the site management team?

a)

Subcontractor

b)

Buyer

c)

Estimator

d)

First aider

5.

Who is responsible for the structural integrity of the building?

a)

Building services engineer

b)

Structural engineer

c)

Civil engineer

d)

Building surveyor

6.

Who is considered the most important person in a construction project?

a)

The contractor

b)

The client

c)

The architect

d)

The engineer

7.

What can a client in a construction project be?

a)

Only an individual

b)

Only a company

c)

Only an organization

d)

An individual, a company, or an organization

8.

What is one of the responsibilities of a client under the Construction Design and Management Regulations?

a)

Designing the building

b)

Managing the budget

c)

Ensuring the health and safety of those on site

d)

Hiring the architect

9.

Who is considered the leader of the management team in a construction project?

a)

The builder

b)

The architect

c)

The client

d)

The engineer

10.

What do architects convert into a building design and working drawings?

a)

The builder's ideas

b)

The engineer's plans

c)

The clients' ideas and requirements

d)

The project's budget

11.

At what stages do architects liaise with the client?

a)

Only at the beginning

b)

Only at the end

c)

At the early stages and throughout the project

d)

Only during the construction phase

12.

Who generally appoints the Clerk of works?

a)

The construction team

b)

The architect

c)

The project manager

d)

The client

13.

What is one of the responsibilities of the Clerk of works?

a)

Designing the building

b)

Ensuring the building is constructed as per the drawings

c)

Marketing the building

d)

Selling the building

14.

Who does the Clerk of works liaise with regularly on site?

a)

The marketing team

b)

The sales team

c)

The architect and the construction teams

d)

The clients

15.

What can the Clerk of works sign?

a)

A sales contract

b)

A marketing plan

c)

A variation order

d)

A design blueprint

16.

What is one of the main tasks of a structural engineer?

a)

Designing the interior of buildings

b)

Calculating loads, forces, and variances from wind and rain

c)

Painting the walls

d)

Installing electrical systems

17.

Who does a structural engineer work closely with to find the most efficient method of construction?

a)

The painter

b)

The electrician

c)

The architect

d)

The plumber

18.

What are structural engineers sometimes involved in besides construction?

a)

Cooking meals

b)

Insurance claims, repair work, and alterations to properties

c)

Teaching classes

d)

Writing books

19.

What is another name for a Surveyor?

a)

Building Inspector

b)

Building Surveyor

c)

Construction Manager

d)

Site Engineer

20.

What is one of the main responsibilities of a Surveyor?

a)

Designing the building

b)

Positioning the building on the land

c)

Managing the construction team

d)

Painting the building

21.

What do Surveyors ensure throughout the building process?

a)

Building Regulations are followed

b)

The building is painted correctly

c)

The construction team is happy

d)

The building is designed well

22.

What do Surveyors do when they encounter problems?

a)

Ignore them

b)

Discuss and try to resolve them

c)

Leave the site

d)

Call the police

23.

How often do Surveyors visit the site?

a)

Once a year

b)

Once a month

c)

Regularly

d)

Never

24.

What is one of the responsibilities of a building services engineer?

a)

Designing the external structure of the building

b)

Designing the internal services within the building

c)

Painting the building

d)

Landscaping the garden

25.

Which of the following is NOT a service designed by a building services engineer?

a)

Heating and ventilation

b)

Hot water and cold water

c)

Air conditioning

d)

Landscaping

26.

What is one of the goals of designing internal services within a building?

a)

To make the building look pretty

b)

To be cost effective and environmentally sensitive

c)

To make the building taller

d)

To add more rooms

27.

Which of the following might a building services engineer be responsible for?

a)

Electrical distribution

b)

Painting the walls

c)

Planting trees

d)

Building roads

28.

What is one of the tasks of a quantity surveyor?

a)

Design the building structure

b)

Suggest construction methods within the client’s budget

c)

Supervise the construction workers

d)

Install electrical systems

29.

What does a quantity surveyor calculate for a project?

a)

The number of construction workers needed

b)

The amount of labour and materials required

c)

The design of the building

d)

The safety measures for the site

30.

What is created from the details calculated by a quantity surveyor?

a)

A safety report

b)

A bill of quantities

c)

A construction plan

d)

A design blueprint

31.

Why does a quantity surveyor visit the construction site?

a)

To design the building

b)

To measure work carried out

c)

To supervise the workers

d)

To install materials

32.

What will the contractor enter into with the client to carry out the work?

a)

A. A partnership

b)

B. A contract

c)

C. A friendship

d)

D. A competition

33.

What will each contractor do for jobs?

a)

A. Negotiate

b)

B. Tender

c)

C. Ignore

d)

D. Avoid

34.

Who will the contractor need to employ to undertake key roles?

a)

A. General workers

b)

B. Specialists within the trade

c)

C. Family members

d)

D. Friends

35.

Who is responsible for sourcing the materials needed to complete a project in a construction team?

a)

Estimator

b)

Buyer

c)

Contractor

d)

Supervisor

36.

What does the estimator do in a construction team?

a)

Sources materials

b)

Breaks down the bill of quantities into unit parts

c)

Supervises the construction site

d)

Designs the building

37.

Which of the following tasks is NOT performed by the buyer in a construction team?

a)

Obtaining quotations from suppliers

b)

Ensuring delivery times

c)

Adding company overheads and profit margin

d)

Quality assurance

38.

Who adds company overheads and profit margin in a construction team?

a)

Buyer

b)

Estimator

c)

Contractor

d)

Supervisor

39.

Who supervises the contract, including creation, planning, and building?

a)

Site agent

b)

Contracts manager

c)

Construction worker

d)

Project assistant

40.

Who liaises with the head office and the site agent?

a)

Site agent

b)

Construction worker

c)

Contracts manager

d)

Project assistant

41.

Who is sometimes known as the construction manager?

a)

Contracts manager

b)

Site agent

c)

Project assistant

d)

Construction worker

42.

Who is responsible for running the site?

a)

Contracts manager

b)

Project assistant

c)

Site agent

d)

Construction worker

43.

Who plans ahead and makes sure the work is carried out safely?

a)

Site agent

b)

Contracts manager

c)

Construction worker

d)

Project assistant

44.

What type of work do subcontractors carry out in a construction team?

a)

General management

b)

Specific or specialist area of work

c)

Financial planning

d)

Marketing

45.

Which of the following is NOT a type of work done by subcontractors?

a)

Plumbing

b)

Heating and ventilation

c)

Marketing

d)

Electrical installation

46.

Subcontractors enter into a contract with whom to carry out their work?

a)

The main building contractor

b)

The project manager

c)

The financial advisor

d)

The marketing team

47.

Which of the following is a type of work done by subcontractors?

a)

Air conditioning

b)

Financial planning

c)

Marketing

d)

General management

48.

Who is sometimes also called the construction manager?

a)

Site supervisor

b)

Architect

c)

Electrician

d)

Plumber

49.

What is one of the responsibilities of a site supervisor?

a)

Designing the building

b)

Running the day-to-day operations of the site

c)

Installing electrical systems

d)

Painting the walls

50.

Which of the following is NOT a responsibility of a site supervisor?

a)

Budgets

b)

Hiring

c)

Deliveries

d)

Cooking meals

51.

What is one of the responsibilities of a trade supervisor?

a)

Designing buildings

b)

Allocation of duties

c)

Cooking meals

d)

Driving trucks

52.

Who is responsible for coordinating with other trades?

a)

Trade supervisor

b)

Architect

c)

Electrician

d)

Plumber

53.

Which of the following is NOT a responsibility of a trade supervisor?

a)

Attendance records

b)

Explaining and enforcing regulations

c)

Overseeing workforce

d)

Painting walls

54.

What does a trade supervisor do to resolve problems and grievances?

a)

Ignore them

b)

Resolve them

c)

Create more problems

d)

Leave the site

55.

Which construction team member is responsible for constructing buildings using bricks, blocks, and stone?

a)

Carpenter

b)

Plumber

c)

Bricklayer

d)

Electrician

56.

What is another name for a carpenter?

a)

Mason

b)

Joiner

c)

Plumber

d)

Electrician

57.

Which construction team member installs hot and cold water, heating, and gas?

a)

Carpenter

b)

Plumber

c)

Bricklayer

d)

Electrician

58.

What is included in the first fix for a carpenter?

a)

Doors and skirting

b)

Pipe carcasses

c)

Doorways, window frames, joists, and trusses

d)

Appliances

59.

What is included in the second fix for a plumber?

a)

Appliances

b)

Doors and skirting

c)

Doorways and window frames

d)

Bricks and blocks

60.

What does an electrician install and test?

a)

Gas pipes and appliances

b)

Large diameter pipework and ducting

c)

Electrical installations for lights, sockets, fire alarms, intruder alarms

d)

Heating systems

61.

What is the first fix for an electrician?

a)

Appliances

b)

Cable, conduit, and trunking

c)

Gas pipes

d)

Heating systems

62.

What is the second fix for an electrician?

a)

Cable, conduit, and trunking

b)

Large diameter pipework

c)

Appliances

d)

Gas pipes

63.

What do heating and ventilation engineers work with?

a)

Electrical installations

b)

Large diameter pipework and ducting

c)

Gas pipes

d)

Appliances

64.

What might a gas fitter be required to install on commercial sites?

a)

Electrical installations

b)

Large diameter pipework

c)

Gas pipes and appliances

d)

Heating systems

65.

What is a plasterer responsible for?

a)

Tiling floors and walls

b)

Painting and wallpapering walls

c)

Wall and ceiling finishes, dry lining, rendering

d)

Installing electrical systems

66.

What is another name for a painter?

a)

Plasterer

b)

Decorator

c)

Tiler

d)

Carpenter

67.

What tasks does a painter perform?

a)

Tiling floors and walls

b)

Installing plumbing systems

c)

Painting and wallpapering walls, ceilings, woodwork

d)

Building furniture

68.

What is a tiler responsible for?

a)

Installing electrical systems

b)

Tiling floors and walls in properties

c)

Painting and wallpapering walls

d)

Building wooden structures

69.

Where might specialists be needed to tile?

a)

Kitchens and living rooms

b)

Swimming pools and wet rooms

c)

Bedrooms and offices

d)

Garages and basements