Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Pavement Best Practices

Total questions: 11

Worksheet time: 6mins

Name
Class
Date
1.

Why is proper compaction of pavement layers important?

a)

Proper compaction reduces the cost of construction

b)

Compaction is only necessary for aesthetic purposes

c)

Proper compaction helps in achieving the desired density and strength of the pavement layers.

d)

Compaction has no impact on pavement durability

2.

Where are the wheel path zone located?

a)

A & D

b)

A & C

c)

B & E

d)

B & D

3.

What are the width of the A and B?

a)

0.3m & 0.5m

b)

0.6m & 0.6m

c)

0.5m & 0.5m

d)

0.5m & 0.6m

4.

Typical 'Ingress' or 'Egress'?

a)

INGRESS

b)

EGRESS

5.

What is the mix designation shown in the table?

a)

14

b)

37.5

c)

25

d)

20

6.

What is the nominal maximum aggregate size of this mix?

a)

12.5

b)

37.5

c)

25

d)

4.75

7.

Who is the least important person to know the approved rolling pattern?

a)

Site Supervisor/ IOW

b)

SOR / PMC Representatives

c)

Roller Operators

d)

Project Manager

e)

Lorry Driver

8.

Which position (s) of the line marking is/are correct?

a)

P & B

b)

B

c)

P

d)

B & R

9.

Which position(s) of the line marking is/are correct?

a)

M, J & K

b)

J, K & R

c)

K & R

d)

M, K & R

10.

What is the name of this type of paving operation?

a)

Hot to cold

b)

Hot to hot

c)

Cold to cold

d)

Cold to hot

11.

What is another name for this paving operation?

a)

SIGMA

b)

ECHELON

c)

GAMMA

d)

Pi