Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Scrum

Total questions: 12

Worksheet time: 4mins

Name
Class
Date
1.

What is the recommended team size of a development team?

a)

3-5

b)

5-10

c)

up to 10

d)

no matter

2.

What role is NOT included in SCRUM?

a)

Development team

b)

Project Manager

c)

Scrum Master

d)

Product Owner

3.

Which artifact in Scrum provides a transparent view of the work that the Development Team will be performing during the Sprint?

a)
  • Product Backlog

b)
  • Sprint Backlog

c)

Increment

d)

Burndown Chart

4.

A Sprint can be canceled before the time-box is over.

a)

True

b)

False

5.

What does it mean if a Product Backlog item is “Done”?

a)

The item is ready for testing

b)

The item has been fully coded

c)

The item meets the Definition of Done and is potentially shippable

d)

The item is documented and awaiting review

6.

What is the primary benefit of conducting a Sprint Retrospective?

a)

To determine the Sprint Goal for the next Sprint

b)

To inspect the last Sprint and create a plan for improvements

c)

To review and prioritize the Product Backlog

d)

To provide performance feedback to team members

7.

In the context of Scrum, what is meant by 'velocity'?

a)

The speed at which a Development Team completes work

b)

The number of Sprints completed in a project

c)

The rate of change in the Product Backlog

d)
  • The amount of work a Development Team completes in a Sprint, typically measured in story points

8.

The Development Team can decide to extend the Sprint duration if they need more time to complete their tasks.

a)

True

b)

False

9.

Who is responsible for ensuring that the Scrum Team adheres to Scrum theory, practices, and rules?

a)

Product Owner

b)

Scrum Master

c)

Development Team

d)

Project Manager

10.

What does the term "Increment" refer to in Scrum?

a)

A list of tasks to be completed

b)

The sum of all Product Backlog items completed during a Sprint and all previous Sprints

c)

The overall project plan

d)

The time frame for a Sprint

11.

The ______ is a visual representation of the remaining work in the Sprint Backlog.

a)

Velocity chart

b)

Burndown chart

c)

Product Increment

d)

Product Backlog

12.

Which Scrum event is dedicated to inspecting and adapting the process?

a)

Sprint Review

b)

Sprint Planning

c)

Daily Scrum

d)

Sprint Retrospective