WorksheetsPOB - Documentation Quiz
Total questions: 12
Worksheet time: 10mins
What should students be able to state according to the objectives?
The history of documentation
The types of documentation software
At least one reason why documents should be stored correctly
The process of creating new documentation
Which of the following is NOT something that site managers or trade supervisors can quickly tell from looking at the programme?
If work is keeping on schedule
What materials, equipment, and labour are required
When materials, equipment, and labour are required
The total cost of the project
Which document is used to detail the costs associated with construction projects?
Invoice
Bill of Quantities
Construction Change Order
Receipt
What type of window is located in the living room according to the schedule?
Inward opening tilt and turn composite aluminum and timber
Vertical sliding painted timber
Central pivot, fully reversible composite aluminum and timber
Inward opening timber bifold doors
What type of locking mechanism is used for the window in the bathroom?
Key lock
Lockable sash lock
Secure night vent
Trickle vents
What additional information is provided for the window in the living room?
Paint color to be agreed with client
Secure night vent
Trickle vents
Fully reversible
On what type of sites are schedules mainly used?
Smaller sites with uniform house designs
Larger sites with many different house designs
Urban sites with commercial buildings
Rural sites with agricultural buildings
What does the Bills of Quantities describe?
The project timeline
Everything required for the job
The budget allocation
The team members
What type of chart is a Programme of the Works normally shown in?
Bar chart
Pie chart
GANTT chart
Line graph
A (a) is responsible for producing the (b) Quantities.
What are Preliminaries?
General information: Names of the architect details of the work and site descriptions
Like a specification. It outlines the quality & description of materials and workmanship
Description of how each task and material is to be measured e.g. meters, millimetres (linear & square)
Based on the drawings, specifications and schedules
Identify at least 2 advantages and 2 disadvantages of planning projects.
