wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

POB - Documentation Quiz

Total questions: 12

Worksheet time: 10mins

Name
Class
Date
1.

What should students be able to state according to the objectives?

a)

The history of documentation

b)

The types of documentation software

c)

At least one reason why documents should be stored correctly

d)

The process of creating new documentation

2.

Which of the following is NOT something that site managers or trade supervisors can quickly tell from looking at the programme?

a)

If work is keeping on schedule

b)

What materials, equipment, and labour are required

c)

When materials, equipment, and labour are required

d)

The total cost of the project

3.

Which document is used to detail the costs associated with construction projects?

a)

Invoice

b)

Bill of Quantities

c)

Construction Change Order

d)

Receipt

4.

What type of window is located in the living room according to the schedule?

a)

Inward opening tilt and turn composite aluminum and timber

b)

Vertical sliding painted timber

c)

Central pivot, fully reversible composite aluminum and timber

d)

Inward opening timber bifold doors

5.

What type of locking mechanism is used for the window in the bathroom?

a)

Key lock

b)

Lockable sash lock

c)

Secure night vent

d)

Trickle vents

6.

What additional information is provided for the window in the living room?

a)

Paint color to be agreed with client

b)

Secure night vent

c)

Trickle vents

d)

Fully reversible

7.

On what type of sites are schedules mainly used?

a)

Smaller sites with uniform house designs

b)

Larger sites with many different house designs

c)

Urban sites with commercial buildings

d)

Rural sites with agricultural buildings

8.

What does the Bills of Quantities describe?

a)

The project timeline

b)

Everything required for the job

c)

The budget allocation

d)

The team members

9.

What type of chart is a Programme of the Works normally shown in?

a)

Bar chart

b)

Pie chart

c)

GANTT chart

d)

Line graph

10.

A ​ (a)   is responsible for producing the ​ (b)   Quantities.

Choose from the below words
Quantity Surveyor
Bill of
Architect
Right of
Set of
Site manager
11.

What are Preliminaries?

a)

General information: Names of the architect details of the work and site descriptions

b)

Like a specification. It outlines the quality & description of materials and workmanship

c)

Description of how each task and material is to be measured e.g. meters, millimetres (linear & square)

d)

Based on the drawings, specifications and schedules

12.

Identify at least 2 advantages and 2 disadvantages of planning projects.

4 lines