wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

CIMS -PART 2

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

What is the goal of Computer Integrated Manufacturing systems?

a)

To manufacture products less effectively

b)

To combine human systems only

c)

To combine electronically the systems and functions necessary to manufacture products more effectively

d)

To eliminate information systems

2.

Which industry is represented by continuous manufacturing?

a)

Automobiles

b)

Chemicals

c)

Books

d)

Prototypes

3.

What type of production involves dedicated production of large quantities of one product?

a)

Batch production

b)

Job shop production

c)

Mass production

d)

Continuous-flow production

4.

What is an advantage of CAD/CAM systems?

a)

Increased lead times

b)

Reduced inventories

c)

Decreased productivity

d)

Reduced customer service

5.

What does PC represent in manufacturing capacity?

a)

Plant capacity

b)

Processing capacity

c)

Production capacity

d)

Productive capacity

6.

What is the typical cycle time equation for a production operation?

a)

Tc = To + Th

b)

Tc = To + Th + Tth

c)

Tc = Th + Tth

d)

Tc = To + Tth

7.

Which type of production involves fully computer automated lines?

a)

Continuous-flow production

b)

Batch production

c)

Mass production

d)

Job shop production

8.

What does CIM stand for?

a)

Computerized Integration Mechanism

b)

Computerized Information Management

c)

Computer Integrated Manufacturing

d)

Continuous Integration Model

9.

What is the main automation achievement in mass production of discrete products?

a)

Automated transfer machines

b)

Partially and fully automated assembly lines

c)

Industrial robots for spot welding

d)

Dial indexing machines

10.

What is the main advantage of CAD/CAM systems related to inventories?

a)

No impact on inventories

b)

Reduced inventories

c)

Increased inventories

d)

Varied inventories

11.

What does U represent in manufacturing metrics?

a)

Unpredictability

b)

Underproduction

c)

Unavailability

d)

Utilization

12.

Which type of production involves production of low quantities, often one of a kind, of specialized products?

a)

Mass production

b)

Continuous-flow production

c)

Job shop production

d)

Batch production

13.

What is the equation for production rate in batch production?

a)

Rp = 60/ Tp

b)

Rp = 60/ Tc

c)

Rp = 60/ Tr

d)

Rp = 60/ Tb

14.

What is the main advantage of CAD/CAM systems related to customer service?

a)

Varied customer service

b)

Improved customer service

c)

No impact on customer service

d)

Decreased customer service

15.

What is the equation for operation cycle time in production?

a)

Tc = To + Th

b)

Tc = To + Tth

c)

Tc = To + Th + Tth

d)

Tc = Th + Tth