What must be established before and after using explosives for demolition?
Safety nets
Exclusion zones
Water barriers
Noise barriers
Which method of demolition is slower and completed by workmen?
Explosives
Machine
Hand Demolition
Hydraulic pushing arm
What is the final step in the six steps to demolition?
Pre-Demolition Survey
Check for Asbestos
Approve Demolition Plan
Have a waste disposal plan
Why is it important to have a waste disposal plan in demolition?
To ensure the building is structurally sound
To prevent health hazards
To manage debris and waste materials
To save costs
What does the acronym "BS" in BS 6817 stand for?
British Standards
Building Standards
Basic Standards
Building Safety
Which step involves ensuring the building is free from hazardous materials?
Disconnect water/gas/electric
Check for Asbestos
Warn people in local area
Waste Disposal Plan
What should be disconnected before demolition begins?
Water, gas, and electric
Internet and phone lines
Sewage and drainage
Heating and cooling systems
Which step is crucial for preventing utility-related accidents during demolition?
Pre-Demolition Survey
Check for Asbestos
Disconnect water/gas/electric
Waste Disposal Plan
What is the significance of BS 6817 in the demolition process?
It is a safety equipment standard
It is a waste disposal guideline
It is a standard for approving the demolition plan
It is a survey method
What is the final step in the pre-demolition process?
Approve Demolition Plan using BS 6817
Pre-Demolition Survey
Have a waste disposal plan
Warn people in local area
Which step should be taken to ensure that the demolition does not pose a risk to the local community?
Pre-Demolition Survey
Check for Asbestos
Warn people in local area
Approve Demolition Plan using BS 6817