Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Building Teams with the Marshmallow Challenge

Total questions: 9

Worksheet time: 5mins

Name
Class
Date
1.

What materials are used in the Marshmallow Challenge?

a)

Spaghetti sticks, tape, string, and a marshmallow.

b)

Plastic straws, scissors, paper clips, and a cookie.

c)

Wooden blocks, glue, rubber bands, and a cupcake.

d)

Cardboard, string, glue, and a chocolate bar.

2.

The marshmallow challenge is a _________ challenge to enhance team collaboration.

a)

building-team

b)

team-building

c)

team-built

d)

built-team

3.

The main goal of the Marshmallow Challenge is to build the tallest ________ structure with a marshmallow on the top.

a)

free-standing

b)

standing-free

c)

standing-freely

d)

free-stood

4.

Who promoted the Marshmallow Challenge?

a)

Jane Doe

b)

Alice Johnson

c)

Tom Wujec

d)

John Smith

5.

Which group built the tallest structures on average?

a)

kindergarteners

b)

architects and engineers

c)

CEOs

d)

business graduates

6.

What is the average height of the structures built in the challenge?

a)

10 inches

b)

20 inches

c)

25 inches

d)

15 inches

7.

The kindergarteners structures are taller than _______ of most adults.

a)

that

b)

those

c)

what

d)

any

8.

What skills does the Marshmallow Challenge aim to develop in teams?

a)

Collaboration, creativity, problem-solving, prototyping, and iterative design.

b)

Technical skills, financial analysis, marketing strategies, and networking.

c)

Research skills, data analysis, strategic planning, and risk assessment.

d)

Time management, leadership, communication, and delegation.

9.

Why is collaboration important in the Marshmallow Challenge?

a)

Collaboration is important because it enhances creativity, teamwork, and problem-solving.

b)

Collaboration is only necessary for large teams.

c)

Collaboration reduces the need for communication.

d)

Collaboration is important for individual recognition.