1) Lines that are parallel in a plan view will be parallel in an isometric view.
True
False
2) Non-isometric lines are easily drawn to scale.
True
False
3) Electrical plans are of no use when installing a plumbing system.
True
False
4) Section drawings show the section of land upon which the structure is to be built.
True
False
5) Plumbing and Mechanical plans are sometimes combined.
True
False
6) Detail drawings take precedent over floor plans.
True
False
7) For positive pressure medical gas systems, piping shall be hard drawn, seamless copper tube, specification
ASTM B88
ASTM B819
ASTM B280
Any of the above
8) Med-Gas joints shall be brazed within _ hours after the surfaces are cleaned for brazing.
One
Four
Eight
Twenty-four
9) Level 1 medical air compressors shall be sized to serve the peak calculated demand and in no case shall there be fewer than ___compressors.
Three
Four
One
Two
10) In a Med Gas System, what valve shall be placed such that a wall intervenes between the valve and outlets/inlets that it controls?
Service
Demand check
Riser
Zone
11) The installation of medical gas and vacuum systems shall be made by experienced, qualified and competent installer. The installers shall meet the requirements of
AWS B3 1.3
ASSE Standard 6010
ASME Section IX
None of the above
12) Medical air sources shall be used only for _____________ and calibration of medical respiratory
devices.
Instrument air
Air-operating devices
Human respiration
All of the above
13) Shutoff valves for positive pressure gases shall
Be cleaned for oxygen service
Be three-piece in construction
Have extensions for brazing
All of the above
14) To assure that all ambient air has been removed from the pipeline prior to brazing,
a/an ____________ shall be used to verify the effectiveness of the purge.
Air analyzer
Nitrogen analyzer
Oxygen Analyzer
Any of the above
15) Backflow Prevention Devices or Assemblies installed in a Potable Water Supply System shall be tested
At the time of installation
A, C, and D
At the time of repair or relocation
Not less than on an annual schedule
16) A certified backflow tester may ______ change the design, material, or operational characteristics of an assembly during maintenance or repair.
Need to
Temporarily
Permanently
NEVER
17) A pressure vacuum breaker must be installed ___ above the highest downstream outlet.
1 inch
6 inch
12 inch
2 feet
18) The term “air gap” in water distribution is
A vent to atmosphere
An air bubble in the piping
An air-line piped to the tank
The unobstructed vertical distance through the free atmosphere between the potable water supply to the flood rim of the vessel or fixture.
19) The minimum air gap separation is
1 inch
3 inches
6 inches
12 inches
20) An RP type back flow assembly should be installed a minimum of __ above a cement slab floor.
6 inches
12 inches
38 inches